Small-Scale Infiltration Basins (Table 5-1 – Quantity, Quality, & Recharge)

Design CriteriaRequiredProvided
Total Drainage Area--Basin A: 0.74 Acres
Min. Storage Volume below 1st Orifice (Net Increase of Impervious 10 Year Storm Volume)Basin A: 0.101 ac-ftBasin A: 0.392 ac-ft
Max. Contributory DA2.5 acresBasin A: 0.787 Acres
Max. Drain Time72 hoursBasin A: 24.65 hours
Separation from SHWT2 feetBasin A: 11.7 feet, additional testing required (SPP-1)
Design Permeability RateMin. = 0.5 in/hr Max. = 10 in/hrBasin A: 10 in/hr (SPP-1)
Max. Depth of WQ Storm2 feetBasin A: 0.20 ft
Pretreatment80% TSS Removal BMP upstream of Underground Basin AHydro International Up-Flo Filter

7. WATER QUANTITY CONTROL COMPLIANCE

The site has been designed to meet the flow reduction requirements as noted in NJAC 7:8-5.6(b)3. The points of analysis have been identified on the Drainage Area Maps as previously described. Below is a summary table demonstrating compliance with the flow reduction requirements. Peak Flow Reduction Calculations are included within the appendix of this report.

Point of Analysis #1 (Study Area West)

Storm EventExisting Peak Flow (CFS)Required ReductionMax. Allowable Peak Flow (CFS)Proposed Peak Flow (CFS)
2-Year Current0.250.500.1250.00
2- Year Projected0.230.500.1150.00
10-Year Current0.410.250.2250.01
10- Year Projected0.450.250.3380.04
100-Year Current1.810.201.2080.88
100- Year Projected2.370.201.8961.27