Summary for Link 8L: Existing Study Area Road (Total)

Inflow Area = 0.150 ac, 20.00% Impervious, Inflow Depth = 4.53" for 100-Year-Projected event Inflow = 0.44 cfs @ 12.20 hrs, Volume = 0.057 af Primary = 0.44 cfs @ 12.20 hrs, Volume = 0.057 af, Atten = 0%, Lag = 0.0 min

Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs

Link 8L: Existing Study Area Road (Total)

Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total)

Inflow Area =0.630 ac, 96.83% Impervious, Inflow Depth = 10.91" for 100-Year-Projected event
Inflow =4.41 cfs @ 12.19 hrs, Volume= 0.573 af
Primary =4.41 cfs @ 12.19 hrs, Volume= 0.573 af, Atten= 0%, Lag= 0.0 min
Routed to Link 16L : Study Area Basin A (Total)

Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs

Fixed water surface Elevation= 117.75'

Link 10L: Study Area Study Area WQ MTD A-110 (Total)