Proposed Conditions Input Summary Table

Drainage Area NameDrainage Area (acres)Time of Concentration (minutes)Curve Number (CN)
Study Area Road Undetained – Imp.0.040.498
Study Area Road Undetained – Perv.0.084.839
Study Area Road Undetained – Total0.12----

Proposed Conditions Flow Summary Table

Current Rainfall DataProjected Rainfall Data
Q2 (CFS)Q10 (CFS)Q100 (CFS)Q2 (CFS)Q10 (CFS)Q100 (CFS)
0.080.130.320.100.130.43

Study Area Road Undetained – Total

5. STORMWATER MANAGEMENT SYSTEM DESIGN

A summary of each basin's water surface elevation (WSEL) and outflow rated for the Water Quality, 2-, 10-, and 100-year storm event for current conditions are provided below. These WSELs and outflows assume normal operating conditions for each basin. Routing calculations for the basin are included in the Appendix.

Basin A Summary Table

Storm Event (years)Water Surface Elevation (ft)Outflow (CFS)
2-Year Current117.820.70
2- Year Projected117.980.70
10-Year Current118.370.70
10- Year Projected118.680.70
100-Year Current119.501.33
100- Year Projected120.001.62
WQ Storm117.700.70

6. GREEN INFRASTRUCTURE COMPLIANCE

The basin noted above has been designed to comply with the stormwater runoff quantity, quality, and groundwater recharge requirements for the proposed development as applicable. The basin has been designed in accordance with NJAC 7:8, NJAC 7:50 and the New Jersey Stormwater Best Management Practices. The table below summarizes the design considerations for each basin, see the Site Plan details for additional information.