Summary for Subcatchment 6S: Ex. Study Area Road (Imp)

Runoff = 0.12 cfs @ 12.19 hrs, Volume= 0.015 af, Depth= 6.10" Routed to Link 8L : Existing Study Area Road (Total)

Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"

Area (ac) CN Description

0.030 98 Paved parking, HSG A

0.030 98 100.00% Impervious Area

Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)

1.0 82 0.0150 1.32 Sheet Flow, A-B Smooth surfaces n = 0.011 P2= 4.04"

1.0 82 Total, Increased to minimum Tc = 10.0 min

Subcatchment 6S: Ex. Study Area Road (Imp)

2026-02 Existing and ProposedNOAA 24-hr D 10-Year-Projected Rainfall=6.34"
Prepared by Dynamic EngineeringPrinted 2/10/2026
HydroCAD\circledR 10.20-8a s/n 08640\circledC 2025 HydroCAD Software Solutions LLCPage 76

Summary for Subcatchment 7S: Ex. Study Area Road (Perv)

Runoff = 0.02 cfs @ 12.53 hrs, Volume= 0.005 af, Depth= 0.55"

Routed to Link 8L : Existing Study Area Road (Total)

Runoff by SCS TR-20 method, UH=Delmarva, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA 24-hr D 10-Year-Projected Rainfall=6.34"

Area (ac)CNDescription
0.12039>75% Grass cover, Good, HSG A
0.12039100.00% Pervious Area
Tc (min)Length (feet)Slope (ft/ft) Velocity (ft/sec) Capacity (cfs)
1.0610.0100 1.06
Sheet Flow, A-B
Smooth surfacesn= 0.011 P2= 4.04"

1.0 61 Total, Increased to minimum Tc = 10.0 min

Subcatchment 7S: Ex. Study Area Road (Perv)