Summary for Link 8L: Existing Study Area Road (Total)

Inflow Area =0.150 ac, 20.00% Impervious, Inflow Depth = 0.80" for 2-Year-Projected event
Inflow =0.08 cfs @ 12.19 hrs, Volume= 0.010 af
Primary =0.08 cfs @ 12.19 hrs, Volume= 0.010 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs

Link 8L: Existing Study Area Road (Total)

Summary for Link 10L: Study Area Study Area WQ MTD A-110 (Total)

Inflow Area =0.630 ac, 96.83% Impervious, Inflow Depth = 3.69" for 2-Year-Projected event
Inflow =1.54 cfs @ 12.19 hrs, Volume= 0.194 af
Primary =1.54 cfs @ 12.19 hrs, Volume= 0.194 af, Atten= 0%, Lag= 0.0 min
Routed to Link 161 : Study Area Basin A (Total)

Routed to Link 16L : Study Area Basin A (Total)

Primary outflow = Inflow, Time Span = 0.00-72.00 hrs, dt = 0.05 hrs

Fixed water surface Elevation= 117.75'

Link 10L: Study Area Study Area WQ MTD A-110 (Total)