TABLE OF CONTENTS
Page No.
- SITE DESCRIPTION AND PROJECT OVERVIEW ..... - 1
- DESIGN OVERVIEW ..... - 1
- EXISTING DRAINAGE CONDITIONS ..... - 3
- PROPOSED DRAINAGE CONDITIONS ..... - 4
- STORMWATER MANAGEMENT SYSTEM DESIGN ..... - 6
- GREEN INFRASTRUCTURE COMPLIANCE ..... - 6
- WATER QUALITY COMPLIANCE ..... - 8
- GROUNDWATER RECHARGE COMPLIANCE ..... - 8
- GROUNDWATER MOUNDING ..... - 8
- PINELANDS NITROGEN REMOVAL REQUIREMENT ..... - 9
- STORM SEWER DESIGN ..... - 9
- SOIL EROSION AND SEDIMENT CONTROL COMPLIANCE ..... - 9
- CONCLUSION ..... - 12
APPENDIX
- NRCS Web Soil Survey
- Hydrograph Summary Reports – Existing & Proposed Conditions 2, 10, & 100-year
- Hydrograph Summary Reports – Existing & Proposed Water Quality Storm
- Hydrograph Comparison – Study Area Road Undetained 2, 10 & 100-year
- Stormwater Collection System Calculations (Pipe Sizing)
- Conduit Outlet Protection Calculations
- Groundwater Recharge Calculation
- Groundwater Mounding Calculation
- Basin Drain Time Calculations
- Offsite Stability Failure Analysis
- Report of Geotechnical & Stormwater Basin Area Investigation, prepared by Dynamic Earth, LLC
- Drainage Area Maps
- Nitrogen Removal Exhibit