TABLE OF CONTENTS

Page No.

  1. SITE DESCRIPTION AND PROJECT OVERVIEW ..... - 1
  2. DESIGN OVERVIEW ..... - 1
  3. EXISTING DRAINAGE CONDITIONS ..... - 3
  4. PROPOSED DRAINAGE CONDITIONS ..... - 4
  5. STORMWATER MANAGEMENT SYSTEM DESIGN ..... - 6
  6. GREEN INFRASTRUCTURE COMPLIANCE ..... - 6
  7. WATER QUALITY COMPLIANCE ..... - 8
  8. GROUNDWATER RECHARGE COMPLIANCE ..... - 8
  9. GROUNDWATER MOUNDING ..... - 8
  10. PINELANDS NITROGEN REMOVAL REQUIREMENT ..... - 9
  11. STORM SEWER DESIGN ..... - 9
  12. SOIL EROSION AND SEDIMENT CONTROL COMPLIANCE ..... - 9
  13. CONCLUSION ..... - 12

APPENDIX

  • NRCS Web Soil Survey
  • Hydrograph Summary Reports – Existing & Proposed Conditions 2, 10, & 100-year
  • Hydrograph Summary Reports – Existing & Proposed Water Quality Storm
  • Hydrograph Comparison – Study Area Road Undetained 2, 10 & 100-year
  • Stormwater Collection System Calculations (Pipe Sizing)
  • Conduit Outlet Protection Calculations
  • Groundwater Recharge Calculation
  • Groundwater Mounding Calculation
  • Basin Drain Time Calculations
  • Offsite Stability Failure Analysis
  • Report of Geotechnical & Stormwater Basin Area Investigation, prepared by Dynamic Earth, LLC
  • Drainage Area Maps
  • Nitrogen Removal Exhibit