Page 3
| TITLE / DESCRIPTION | PREPARED / SIGNED / SEALED BY | DATE | DATE LAST REVISED |
|---|---|---|---|
| Submission Letter to Bureau of Fire Prevention Jackson District #2 for Approval | Richard T. Ortiz, P.E. Dynamic Engineering | 7/16/2025 | |
| Submission Letter to Jackson Police Department Traffic Safety Bureau for Approval | 7/16/2025 | ||
| Response Letter to Bureau of Fire Prevention Jackson District #2 | 2/13/2026 | ||
| Response Letter | Rodman R. Ritchie, P.E. Richard T. Ortiz, P.E. Dynamic Engineering | 2/13/2026 | |
| Preliminary and Final Major Site Plan for 1980 Swarthmore LLC, Proposed Office Building, consisting of 22 sheets | Rodman R. Ritchie, P.E. Dynamic Engineering | 8/25/2023 | 2/13/2026 |
| Preliminary Forcemain Layout consisting of 2 sheets | 2/12/2026 | ||
| Environmental Impact Statement | 2/2026 | ||
| Boundary, Location & Topographic Survey consisting of 1 sheet | Craig Black, P.L.S. Dynamic Survey, LLC | 10/22/2021 | |
| Architectural Presentation Set of Floor Plans and Elevations consisting of 5 sheets (Unsigned and Unsealed) | Rise Architecture | 2/12/2026 | |
| Traffic Impact and Parking Assessment | Justin Taylor, P.E., P.T.O.E. John Pesce, P.E. Dynamic Traffic, LLC | 10/12/2023 | 2/12/2026 |
| Left Turn Access Painted Median | 2/12/2026 | ||
| Inconsistent Certificate of Filing | Charles M. Horner, P.P., Director Pinelands Commission | 6/2/2025 | |
| Phase I Environmental Site Assessment Report | Spencer Spurlock, Principal David Backman, Senior Principal Dynamic Earth, LLC | 6/17/2022 | |
| Phase II Investigation Report | 11/8/2022 |