Page 3
| TITLE / DESCRIPTION | PREPARED / SIGNED / SEALED BY | DATE | DATE LAST REVISED |
|---|
| Submission Letter to Bureau of Fire Prevention Jackson District #2 for Approval | Richard T. Ortiz, P.E. Dynamic Engineering | 7/16/2025 | |
| Submission Letter to Jackson Police Department Traffic Safety Bureau for Approval | 7/16/2025 | |
| Response Letter to Bureau of Fire Prevention Jackson District #2 | 2/13/2026 | |
| Response Letter | Rodman R. Ritchie, P.E. Richard T. Ortiz, P.E. Dynamic Engineering | 2/13/2026 | |
| Preliminary and Final Major Site Plan for 1980 Swarthmore LLC, Proposed Office Building, consisting of 22 sheets | Rodman R. Ritchie, P.E. Dynamic Engineering | 8/25/2023 | 2/13/2026 |
| Preliminary Forcemain Layout consisting of 2 sheets | 2/12/2026 | |
| Environmental Impact Statement | 2/2026 | |
| Boundary, Location & Topographic Survey consisting of 1 sheet | Craig Black, P.L.S. Dynamic Survey, LLC | 10/22/2021 | |
| Architectural Presentation Set of Floor Plans and Elevations consisting of 5 sheets (Unsigned and Unsealed) | Rise Architecture | 2/12/2026 | |
| Traffic Impact and Parking Assessment | Justin Taylor, P.E., P.T.O.E. John Pesce, P.E. Dynamic Traffic, LLC | 10/12/2023 | 2/12/2026 |
| Left Turn Access Painted Median | 2/12/2026 | |
| Inconsistent Certificate of Filing | Charles M. Horner, P.P., Director Pinelands Commission | 6/2/2025 | |
| Phase I Environmental Site Assessment Report | Spencer Spurlock, Principal David Backman, Senior Principal Dynamic Earth, LLC | 6/17/2022 | |
| Phase II Investigation Report | 11/8/2022 | |
The subject property is located within the RGC-2 – Regional Growth Commercial Zoning District (Per §244-96 of the Jackson Township Ordinance). The Applicant is seeking preliminary and final site plan approval to construct a 14,979-sf, 3-story office building for 6 tenants.
Per §244-96A(1) the principal uses permitted in the RGC-2 Regional Growth Commercial Zone are the same as permitted in the PVC-2 Pinelands Village Commercial Zone §244-94A.