FOR CONTAINER-GROWN TREES, USE FINGERS OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING THE PERIMETER OF THE CONTAINER THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. SOIL AMENDMENTS:
PLANT SCHEDULE - WEST RESTORATION AREA
MODIFIED ERNMX-177 BY ERNST CONSERVATION SEEDS INC. (QUOTE NUMBER Q296329):
ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ENGINEER AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF THE ENGINEER.
DIFY HEAVY CLAY OR SILT SOILS (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) OR GYPSUM DIFY EXTREMELY SANDY SOILS (MORE THAN 85% SAND) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX
Bulk Qty
PLS Qty
UOM
Item Number
Description
0.000
EACH
PINELANDS GRASS MIX
Modified ERNMX-177
2.100
LB BLK
ANDGER01
Big Bluestem, 'Niagara'
3.100
LB BLK
SORNUT08
Indiangrass, PA Ecotype
2.100
LB BLK
PANVIR32
Switchgrass, 'Habitat'-NJ Ecotype
3.100
LB BLK
ELYVIR07
Virginia Wildrye, Madison-NY Ecotype
4.100
LB BLK
SCHSCO08
Little Bluestem, Fort Indiantown Gap-PA Ecotype
0.500
LB BLK
ANDVIR01
Broomsedge, MO Ecotype
ZONE 1
19,738 SF
ZUNE T
19,738 SF
JUNIPERUS VIRGINIANA / EASTERN REDCEDAR
41
3-4" MIN., SEEDLING
20% @ 120" oc
NYSSA SYLVATICA / TUPELO
31
3-4" MIN., SEEDLING
15% @ 120" oc
PINUS RIGIDA / PITCH PINE
51
3-4" MIN., SEEDLING
25% @ 120" oc
QUERCUS ALBA / WHITE OAK
45
3-4" MIN., SEEDLING
22% @ 120" oc
QUERCUS STELLATA / POST OAK
37
3-4" MIN., SEEDLING
18% @ 120" oc
JACKSON TOWNSHIP LANDSCAPE NOTES
SPECIFIED ARBORTIE GREEN (OR WHITE) STAKING AND GUYING MATERIAL IS TO BE FLAT WOVEN POLYPROPYLENE MATERIAL. 3/4" (19.05MM) WIDE 900 LB. BREAK STRENGTH.
ARBORTIE SHALL BE FASTENED TO STAKES IN A MANNER WHICH PERMITS TREE MOVEMENT AND SUPPORTS THE TREE.
E Civil Core
CONSULTING
CIVIL CORE CONSULTING, LLC
1969 RUTGERS UNIVERSITY BLVD.
LAKEWOOD, NJ 08701
ALL TREE STUMPS AND OTHER TREE PARTS OR OTHER DEBRIS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH THE LAW. NO TREE STUMPS, PORTIONS OF A TREE TRUNK OR LIMBS SHALL BE BURIED ANYWHERE IN THE DEVELOPMENT.
AND DISPOSED OF IN ACCORDANCE WITH THE LAW. NO TREE STUMPS LIMBS SHALL BE BURIED ANYWHERE IN THE DEVELOPMENT.
THE DEVELOPER SHALL SELECTIVELY THIN OR REMOVE ALL DEAD OR DYING VEGETATION, EITHER STANDING OR FALLEN, AND SHALL REMOVE, INCLUDING GRUBBING OUT STUMPS, ALL UNDESIRABLE TREES AND OTHER GROWTH.
NO TOPSOIL SHALL BE REMOVED FROM THE SITE OR USED AS SPOIL. ALL REGRADED AREAS AND ALL LAWN AREAS SHALL BE COVERED BY FOUR-INCH MINIMUM THICKNESS OF TOPSOIL.
PLANT SCHEDULE - EAST RESTORATION AREA
4. AN IDENTIFICATION TAG ATTACHED AT THE NURSERY INDICATING THE EXACT VARIETY WILL BE REQUIRED ON AT LEAST THREE OF EACH VARIETY PLANTED
TO STAKE AVOID PURCHASING TREES WITH TWO LEADERS OR REMOVE ONE AT PLANTING: OTHERWISE, DO NOT PRUNE TREE AT PLANTING EXCEPT FOR SPECIFIC STRUCTURAL CORRECTIONS JUNIPERUS VIRGINIANA / EASTERN REDCEDAR 4 3-4" MIN., SEEDLING 4 20% @ 120o cc 1. FOR CONTAINER-GROWN TREES, USE FINGERS OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING THE PERIMETER OF THE CONTAINER 2. THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. 3-4" MIN., SEEDLING 5 3-4" MIN., SEEDLING 5 3-4" MIN., SE
SITE PREPARATION
ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A 2-YEAR PERIOD.
INVASIVE SPECIES, PARTICULARLY THOSE THAT WILL ADAPT TO WET CONDITIONS, SHOULD BE REMOVED OR SPRAYED BEFORE THEY BECOME INCORPORATED INTO THE SITE. NORMAL VEGETATION CAN BE WORKED INTO THE TOPSOIL, WHICH SHOULD BE STOCKPILED UNTIL THE FINAL GRADE HAS BEEN ESTABLISHED. WITH THE ENGINEER'S SPECIFICATIONS AND DIMENSIONS IN HAND, ON-SITE CONSTRUCTION OF THE BERM AND OUTLETS MUST BE EXECUTED CAREFULLY IN ORDER TO MAINTAIN STRUCTURAL INTEGRITY. THE INFILTRATION AND PLANT GROWTH AREAS SHOULD BE LOOSE AND FRIABLE, HIGH IN ORGANIC MATTER, AND COMPLETED WITHOUT COMPACTIONS FROM HEAVY EQUIPMENT. BY USING THE "DIG AND DROP" METHOD, ONE CAN USE AN EXCAVATOR TO DIG AND DROP EACH AREA OF THE BOTTOM SOIL IN A LOOSE MANNER. AT THIS POINT, ONE CAN INCORPORATE LIME, COMPOSTED LEAVES, AND/OR GRASS CLIPPINGS. THE EXCAVATION MACHINE DOES NOT MOVE OVER THE FINISHED SURFACE, THUS AVOIDING UNNECESSARY COMPACTION. NATIVE VEGETATION CAN BE PLANTED OR SEEDED OVER THIS UNEVEN, ABSORBENT SURFACE.
IF IRRIGATION IS NEEDED IT SHOULD BE DESIGNED BY A NJDEP CERTIFIED IRRIGATION CONTRACTOR
REFORESTATION SPECIFICATIONS
TWO RESTORATION AREAS HAVE BEEN PROPOSED; AN EAST RESTORATION AREA OF 1,921 SQUARE FEET AND A WEST RESTORATION AREA OF 19,738 SQ.
THE LANDSCAPE CONTRACTOR SHALL DISC BOTH AREAS PRIOR TO PLANTING TO ENSURE PROPER ROOT GROWTH AND DEVELOPMENT OF THE PROPOSED SEEDLINGS. IN ADDITION, ALL NON-NATIVE INVASIVE SPECIES WITHIN THE RESTORATIONS AREAS SHALL BE REMOVED PRIOR TO PLANTING.
SEEDLINGS SHALL BE AT LEAST 3-4" IN HEIGHT AT THE TIME OF PLANTING AND SHALL BE SPACED NO MORE THAN 10' ON CENTER.
SEEDLINGS WILL BE SET PLUMB AND STRAIGHT AND WILL ALSO BE SET AT SUCH LEVEL THAT AFTER SETTLEMENT A NORMAL OR NATURAL RELATIONSHIP TO THE CROWN OF THE PLANT WITH THE GROUND SURFACE WILL BE ESTABLISHED.
THE RESTORATION AREAS SHALL BE SUPPLEMENTED WITH ERNST SEED MIX 127. PROPER SITE PREPARATION, SEEDING AND PLANTING METHODS AND GENERAL MAINTENANCE CAN BE FOUND IN THE ERNST SEED CO. SEED MIX SEEDING SPECIFICATIONS ON THIS SHEET.
AT THE TIME OF INSTALLATION, THE CONTRACTOR SHALL WATER NEWLY INSTALLED PLANT MATERIAL. THE CONTRACTOR SHALL PROVIDE REGULAR WATERING TO ENSURE THE ESTABLISHMENT, GROWTH,
SEEDING AND PLANTING METHODS
NJ CERTIFICATE OF AUTHORIZATION NO. 24GA28399400
ARBORTIE NOTES:
SEEDING AND PLANTING SHOULD BEGIN IMMEDIATELY UPON COMPLETION OF THE STRUCTURE WHEN THE SOIL IS STILL FRIABLE AND BEFORE INVASIVE WEEDS EMERGE. PLAN SEEDING AND PLANTING BEFORE THE BASIN IS FLOODED, OR ALLOW THE BASIN TO DRAIN TO A FEW INCHES BEFORE SEEDING. BROADCAST SEED EVENLY OVER EACH UNIT BY HAND SEEDING OR HYDROSEEDING. SEEDING RATES ARE GENERALLY LOW (1/2 LB PER 1,000 SQ FT). THE USE OF A SEED FILLER; I.E., PAM-12, CAN BE USED TO CREATE A MIX OF 10 LB PER 1,000 SQ FT (I.E., 9-1/2 LB OF PAM-12 MIXED WITH 1/2 LB OF SEED), WHICH CAN BE BROADCAST EVENLY OVER THE AREA. BARLEY, OATS, OR RYE CAN PROVIDE TEMPORARY VEGETATION TO PROTECT THE SOIL IN STORM WATER MANAGEMENT FACILITIES UNTIL PERMANENT VEGETATION CAN BE ESTABLISHED. THE USE OF NATIVE SPECIES; I.E., VIRGINIA WILD RYE, CAN CREATE AN INTERMEDIATE VEGETATIVE COVER THAT SUCCEEDS TO NATIVE LONG-TERM VEGETATION. STRAW MULCH OR STRAW COCONUT MATS ARE FREQUENTLY USED TO CONTROL EROSION AND PROTECT EMERGING SEEDLINGS FROM EXTREME TEMPERATURES AND DRYING OUT. MULCH SHOULD BE SPARSE TO ALLOW SUNLIGHT TO REACH THE GROUND. TRANSPLANTED SEEDLINGS AND SHRUBS NEED TEMPORARY WATER UNTIL THEY BECOME WELL ROOTED. IRRIGATION OF SEEDS ARE AS OF VALUE UNTIL SEEDLINGS BECOME ESTABLISHED. 2. THE LANDSCAPE CONTRACTOR SHALL DISC BOTH AREAS PRIOR TO PLANTING TO ENSURE PROPER ROOT GROWTH AND DEVELOPMENT OF THE PROPOSED SEEDLINGS. IN ADDITION, ALL NON-NATIVE INVASIVE SPECIES WITHIN THE RESTORATIONS ARE AS SHALL BE REMOVED PRIOR TO PLANTING.
SEEDLINGS SHALL BE AT LEAST 3-4" IN HEIGHT AT THE TIME OF PLANTING AND SHALL BE SPACED NO MORE THAN 10' ON CENTER. 4. SEEDLINGS WILL BE SET PLUMB AND STRAIGHT AND WILL ALSO BE SET AT SUCH LEVEL THAT AFTER SETTLEMENT A NORMAL OR NATURAL RELATIONSHIP TO THE CROWN OF THE PLANT WITH THE GROUND SURFACE WILL BE ESTABLISHED.
THE RESTORATION AREAS SHALL BE SUPPLEMENTED WITH ERNST SEED MIX 127. PROPER SITE PREPARATION, SEEDING AND PLANTING METHODS AND GENERAL MAINTENANCE CAN BE FOUND IN THE ERNST SEED CO. SEED MIX SEEDING SPECIFICATIONS ON THIS SHEET.
AT THE TIME OF INSTALLATION, THE CONTRACTOR SHALL WATER NEWLY INSTALLED PLANT MATERIAL. THE CONTRACTOR SHALL PROVIDE REGULAR WATERING TO ENSURE THE ESTABLISHMENT, GROWTH, AND SURVIVAL OF PLANTS
PROJECT: PRELIMINARY & FINAL MAJOR SITE PLAN FOR BLOCK 22401, LOT 7-12 LOCATION: JACKSON TOWNSHIP OCEAN COUNTY NEW JERSEY
SPECIFIED ARBORTIE GREEN (OR WHITE) STAKING AND GUYING MATERIAL IS TO BE FLAT WOVEN POLYPROPYLENE MATERIAL. 3/4" (19.05MM) WIDE 900 LB. REAK STRENGTH.
ARBORTIE SHALL BE FASTENED TO STAKES IN A MANNER WHICH PERMITS TREE MOVEMENT AND SUPPORTS THE TREE.
- APPROTIE
[F26]
GENERAL MAINTENANCE
IN ADDITION TO STRUCTURAL MAINTENANCE, SILTATION NEEDS TO BE REMOVED AS NEEDED. PLANTS NEED TO BE TRIMMED BACK TO MAINTAIN AESTHETIC VALUE AND INVASIVE SPECIES NEED TO BE CONTROLLED. CLOSE MOWING OR EXTENSIVE CHEMICAL USE IS NOT CONDUCIVE TO WATER QUALITY IMPROVEMENT AND WILDLIFE HABITAT.
THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF 1 YEAR FROM APPROVAL OF LANDSCAPE INSTALLATION BY THE PROJECT LANDSCAPE ARCHITECT, MUNICIPAL OFFICIAL, OR OWNER/OWNER'S REPRESENTATIVE. LANDSCAPE CONTRACTOR SHALL SUPPLY THE OWNER WITH A MAINTENANCE BOND IN THE AMOUNT OF 10% OF THE VALUE OF THE LANDSCAPE INSTALLATION WHICH WILL BE RELEASED AT THE CONCLUSION OF THE GUARANTEE PERIOD AND ONCE FINAL ACCEPTANCE HAS BEEN GRANTED BY THE PROJECT LANDSCAPE ARCHITECT, MUNICIPAL OFFICIAL, OR OWNER/OWNER'S REPRESENTATIVE.
GIPAL
AVOID PURCHASING TREES WITH TWO LEADERS OR REMOVE ONE AT PLANTING - OTHERWISE, DO NOT PRUNE TREE AT PLANTING EXCEPT FOR SPECIFIC STRUCTURAL CORRECTIONS
THE LANDSCAPE CONTRACTOR SHALL REMOVE AND REPLACE DYING, DEAD, OR DEFECTIVE PLANT MATERIAL AT HIS EXPENSE. THE LANDSCAPE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY HIS COMPANY'S OPERATIONS.
ALL REPLACEMENT PLANTS SHALL BE OF THE SAME SPECIES AND SIZE AS SPECIFIED ON THE APPROVED OR FINAL PLANT LIST. REPLACEMENTS RESULTING FROM REMOVAL, LOSS, OR DAMAGE DUE TO OCCUPANCY OF THE PROJECT IN ANY PART, VANDALISM, PHYSICAL DAMAGE BY ANIMALS, VEHICLES, ETC., AND LOSSES DUE TO CURTAILMENT OF WATER BY LOCAL AUTHORITIES SHALL BE APPROVED AND PAID FOR BY THE OWNER.
INSTALLATION SHALL OCCUR DURING THE FOLLOWING SEASONS:
PLANTS (MARCH 15 - DECEMBER 15)
LAWNS (MARCH 15 - JUNE 15 OR SEPTEMBER 1 - DECEMBER 1)
THE FOLLOWING TREES ARE SUSCEPTIBLE TO TRANSPLANT SHOCK AND SHALL NOT BE PLANTED DURING THE FALL SEASON (STARTING SEPTEMBER 15): JUNIPERUS VIRGINIANA, NYSSA SYLVATICA, QUERCUS ALBA, AND QUERCUS STELLATA.
TREE PROTECTION FENCE SHALL BE INSTALLED TO FOLLOW TREE CANOPY DRIP LINE OR PROPOSED LIMITS OF DISTURBANCE.
CONSTRUCTION VEHICLES TO STAY AS FAR AS POSSIBLE FROM TREE PROTECTION FENCE TO PREVENT COMPACTION OF TREE ROOTS.
TREE PROTECTION ZONE/DRIPLINE
DRAWING TITLE:
BUFFER RESTORATION PLAN
4' TALL FLUORESCENT ORANGE HIGH-DENSITY CONSTRUCTION FENCE OR APPROVED EQUAL
— AREA WITHIN TREE
PROTECTION ZONE TO
REMAIN UNDISTURBED
DURING CONSTRUCTION
THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF 1 YEAR FROM APPROVAL OF LANDSCAPE INSTALLATION BY THE PROJECT LANDSCAPE ARCHITECT, MUNICIPAL OFFICIAL, OR OWNER/OWNER'S REPRESENTATIVE. LANDSCAPE CONTRACTOR SHALL SUPPLY THE OWNER WITH A MAINTENANCE BOND IN THE AMOUNT OF 10% OF THE VALUE OF THE LANDSCAPE INSTALLATION WHICH WILL BE RELEASED AT THE CONCLUSION OF THE GUARANTEE PERIOD AND ONCE FINAL ACCEPTANCE HAS BEEN GRANTED BY THE PROJECT LANDSCAPE ARCHITECT, MUNICIPAL OFFICIAL OR OWNER/OWNER'S REPRESENTATIVE
THE LANDSCAPE CONTRACTOR SHALL REMOVE AND REPLACE DYING, DEAD, OR DEFECTIVE PLANT MATERIAL AT HIS EXPENSE. THE LANDSCAPE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY HIS COMPANY'S OPERATIONS.
ALL REPLACEMENT PLANTS SHALL BE OF THE SAME SPECIES AND SIZE AS SPECIFIED ON THE APPROVED OR FINAL PLANT LIST. REPLACEMENTS RESULTING FROM REMOVAL, LOSS, OR DAMAGE DUE TO OCCUPANCY OF THE PROJECT IN ANY PART, VANDALISM, PHYSICAL DAMAGE BY ANIMALS, VEHICLES, ETC., AND LOSSES DUE TO CURTAILMENT OF WATER BY LOCAL AUTHORITIES SHALL BE APPROVED AND PAID FOR BY THE OWNER.
INSTALLATION SHALL OCCUR DURING THE FOLLOWING SEASONS:
PLANTS (MARCH 15 - DECEMBER 15)
LAWNS (MARCH 15 - JUNE 15 OR SEPTEMBER 1 - DECEMBER 1)
THE FOLLOWING TREES ARE SUSCEPTIBLE TO TRANSPLANT SHOCK AND SHALL NOT BE PLANTED DURING THE FALL SEASON (STARTING SEPTEMBER 15):
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
23089
09/21/23
AY
YP
6' LONG WOOD OR STEEL FENCE POSTS. POSTS SHALL BE SPACED HORIZONTALLY 8' ON CENTER MAXIMUM.
STATE OF NEW JERSEY SEF PORT NO. GE55583 Digitally signed by Yosef Portnoy Date: 2026.01.19 11:34:37-05'00' SCALE AS NOTED
SHEET NO 09 OF 24
[F2] YOSEF PORTNOY
LICENSED PROFESSIONAL ENGINEER NJ LICENSE NO: GE53593