SOIL COMPACTION TESTING REQUIREMENTS
SUBGRADE SOILS PRIOR TO THE APPLICATION OF TOPSOIL (SEE PERMANENT SEEDING AND STABILIZATION NOTES FOR TOPSOIL REQUIREMENTS) SHALL BE FREE OF EXCESSIVE COMPACTION TO A DEPTH OF 6.0 INCHES TO ENHANCE THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER.
AREAS OF THE SITE WHICH ARE SUBJECT TO COMPACTION TESTING AND/OR MITIGATION ARE GRAPHICALLY DENOTED ON THE CERTIFIED SOILEROSION CONTROL PLAN. SEE EXAMPLE SITE PLAN AT: HTTP://WWW.NJ.GOV/AGRICULTURE/DIVISIONS/ANR/NRC/ NJEROSION.HTML
COMPACTION TESTING LOCATIONS ARE DENOTED ON THE PLAN. A COPY OF THE PLAN OR PORTION OF THE PLAN SHALL BE USED TO MARKLOCATIONS OF TESTS, AND ATTACHED TO THE SOIL COMPACTION MITIGATION VERIFICATION FORM, AVAILABLE FROM THE LOCAL SOIL CONSERVATION DISTRICT OR
HTTP://WWW.NJ.GOV/AGRICULTURE/DIVISIONS/ANR/NRC/ NJEROSION.HTML. THIS FORM MUST BE FILLED OUT AND SUBMITTED PRIOR TO RECEIVING A CERTIFICATE OF COMPLIANCE FROM THE DISTRICT.
4.IN THE EVENT THAT TESTING INDICATES COMPACTION IN EXCESS OF THE MAXIMUM THRESHOLDS INDICATED FOR THE SIMPLIFIED TESTINGMETHODS (SEE DETAILS BELOW), THE CONTRACTOR/OWNER SHALL HAVE THE OPTION TO PERFORM
CONTRACTOR/OWNER SHALL HAVE THE OPTION TO PERFORM EITHER
COMPACTION MITIGATION OVER THE ENTIRE MITIGATION AREA DENOTED ON THE PLAN (EXCLUDING EXEMPT AREAS), OR
PERFORM ADDITIONAL, MORE DETAILED TESTING TO ESTABLISH THE LIMITS OF EXCESSIVE COMPACTION WHEREUPON ONLY THE EXCESSIVELY COMPACTED AREAS WOULD REQUIRE COMPACTION MITIGATION. ADDITIONAL DETAILED TESTING SHALL BE PERFORMED BY A TRAINED, LICENSED PROFESSIONAL. COMPACTION TESTING METHODS
PROBING WIRE TEST (SEE DETAIL
TUBE BULK DENSITY TEST (LICENSED PROFESSIONAL ENGINEER REQUIRED
NUCLEAR DENSITY TEST (LICENSED PROFESSIONAL ENGINEER REQUIRED)
NOTE: ADDITIONAL TESTING METHODS WHICH CONFORM TO ASTM STANDARDS AND SPECIFICATIONS, AND WHICH PRODUCE A DRY WEIGHT, SOIL BULK DENSITY MEASUREMENT MAY BE ALLOWED SUBJECT TO DISTRICT APPROVAL.
SOIL COMPACTION TESTING IS NOT REQUIRED IF/WHEN SUBSOIL COMPACTION REMEDIATION (SCARIFICATION/TILLAGE (6" MINIMUM DEPTH) OR SIMILAR) IS PROPOSED AS PART OF THE SEQUENCE OF CONSTRUCTION.
PROCEDURES FOR SOIL COMPACTION MITIGATION
PROCEDURES SHALL BE USED TO MITIGATE EXCESSIVE SOIL COMPACTION PRIOR TO PLACEMENT OF TOPSOIL AND ESTABLISHMENT OF PERMANENT VEGETATIVE COVER. RESTORATION OF COMPACTED SOILS SHALL BE THROUGH DEEF
SCARIFICATION/TILLAGE (6" MINIMUM DEPTH) WHERE THERE IS NO DANGER TO UNDERGROUND UTILITIES (CABLES, IRRIGATION SYSTEMS, ETC.). IN THE ALTERNATIVE, ANOTHER METHOD AS SPECIFIED BY A NEW JERSEY LICENSED PROFESSIONAL ENGINEER MAYBE SUBSTITUTED SUBJECT TO DISTRICT APPROVAL.
SOIL COMPACTION MITIGATION NOTES
PROCEDURES SHALL BE USED TO MITIGATE EXCESSIVE SOIL COMPACTION PRIOR TO PLACEMENT OF TOPSOIL AND ESTABLISHMENT OF PERMANENT VEGETATIVE COVER.
RESTORATION OF COMPACTED SOILS SHALL BE THROUGH DEEP SCARIFICATION/TILLAGE (6" MINIMUM DEPTH) WHERE THERE IS NO DANGER TO UNDERGROUND UTILITIES (CABLES, IRRIGATION SYSTEMS, ETC.). IN THE ALTERNATIVE, ANOTHER METHOD AS SPECIFIED BY A NEW JERSEY LICENSED PROFESSIONAL ENGINEER MAY BE SUBSTITUTED SUBJECT TO DISTRICT APPROVAL.
SOIL COMPACTION TESTING IS NOT REQUIRED IF/WHEN SUBSOIL COMPACTION REMEDIATION (SCARIFICATION/TILLAGE 6" MINIMUM DEPTH) IS PROPOSED AS PART OF THE SEQUENCE OF CONSTRUCTION. GAUGE READING – SHOULD BE 300 PSI OR LESS AT 6" DEPTH
PENETROMETER MAY BERE-INSERTED IF/WHEN ANOBSTRUCTION (ROCK, ROOT, DEBRIS) IS ENCOUNTERED) HOLD WIRE HEREWIRE MUST PENETRATE AMINIMUM OF 6" WITHOUTDEFORMATION18"-21"
NOTE:
SOIL SHOULD BE MOIST BUT NOT SATURATED. DO NOT TEST WHEN THE SOIL IS EXCESSIVELY DRY OR SUBJECT TO FREEZING TEMPERATURES. SLOW, STEADY DOWNWARD PRESSURE USED TO ADVANCE THE PROBE. PROBE MUST PENETRATE AT LEAST 6" WITH LESS THAN 300 PSI READING ON THE GAUGE.
USE 1/2" TIP FOR FIRM SOIL, 3/4" TIP FOR SOFT SOIL.
NOTES:
SOIL SHOULD BE MOIST BUT NOT SATURATED. DO NOT TEST WHEN THE SOIL IS EXCESSIVELY DRY OR SUBJECT TO FREEZING TEMPERATURES. SLOW, STEADY DOWNWARD PRESSURE USED TO ADVANCE THE WIRE.
RECORD THE DEPTH OF PENETRATION WHEN WIRE IS DEFORMED.
HANDHELD SOIL PENETROMETER TEST DETAIL NOT TO SCALE
PROBING WIRE TEST DETAIL NOT TO SCALE
NOTE:
SOIL COMPACTION TESTING LOCATIONS IDENTIFIED ARE RECOMMENDED LOCATIONS FOR GRADED/DISTURBED AREAS WITHIN THE VICINITY OF BUILDING AND STRUCTURES OR ON INDIVIDUAL LOTS. MINIMUM TWO (2) TEST PITS PER LOT UP TO 1 ACRE OF DISTURBANCE.
FOR GRADED/DISTURBED AREAS WITHIN OPEN OR COMMON SPACES, SOIL COMPACTION TESTING SHALL BE PERFORMED AT TWO (2) TEST PITS PER ACRE OF OVERALL LIMIT OF DISTURBANCE, EVENLY DISTRIBUTED.
LEGEND:
SOIL COMPACTION TESTING AREAS
RECOMMENDED SOIL COMPACTION TEST LOCATIONS
1. BAGS SHALL BE LOCATED FOR EASE OF CLEAN-OUT AND DISPOSAL OF TRAPPED SEDIMENT AND TO MINIMIZE INTERFERENCE WITH CONSTRUCTION ACTIVITIES AND PEDESTRIAN TRAFFIC. BAGS SHALL NOT BE PLACED DIRECTLY IN RECEIVING WATERS. 2. SEDIMENT CONTROL BAGS MUST BE LOCATED AWAY FROM RECEIVING WATERS AND DISPOSED OF ACCORDING TO MANUFACTURERS INSTRUCTIONS. BAGS MAY NOT BE REUSED. BAGS MAY BE COMBINED WITH TEMPORARY FILTERS (SEE 3 BELOW) FOR ENHANCED FILTRATION. 3. FOR SMALL QUANTITIES OF PONDED WATER SUCH AS MAY BE FOUND IN SHALLOW EXCAVATIONS (SMALL TRENCHES, MANHOLE INSTALLATIONS, ETC.) A SEDIMENT FILTER MAY BE CONSTRUCTED USING COMBINATIONS OF HAY BALES, SMALL CLEAN STONE, AND FILTER FABRIC. THIS METHOD IS LIMITED TO SMALL QUANTITIES OF TRAPPED SURFACE WATER (PUMPING OF WELL POINTS IS EXCLUDED FROM THIS STANDARD) AND WHERE SEDIMENTS ARE NOT HIGHLY COLLOIDAL IN NATURE.
PLAN VIEW
SEASONAL HIGH WATER TABLE ▽
NOTES:
SECTION
ENGINEERING PROPERTIES: 1. COMPRESSIVE STRENGTH OF EZ ROLL: EMPTY PAVERS: ULTIMATE LOAD = 53,683 LBS / 373 PSI FILLED PAVERS: ULTIMATE LOAD = 400,000 LBS
TOP SOIL FILL:
NDS RECOMMENDS NATIVE TOP SOIL FOR BACKFILL INSIDE THE PAVERS.
EXTEND TOP SOIL INSIDE PAVER AN ADDITIONAL 5 INCH ABOVE PAVER SURFACE AND MATCH SURROUNDING GRADE. PROPOSED
FINISHED GRADE SLOPE PER PROJECT GRADING PLAN. PROTECT PAVER AREA UNTIL GRASS IS SUFFICIENTLY ESTABLISHED TO HANDLE
TRAFFIC. PROVIDE 1" (MIN.) CLEARANCE BETWEEN ANY CONCRETE EDGE AND PAVER.
GRASS PAVERS ARE TO BE USED FOR AREAS OF PEDESTRIAN USE, EROSION CONTROL, AND OCCASIONAL VEHICULAR TRAFFIC USE
(E.G., OVERFLOW PARKING AND EMERGENCY/FIRE LANES).
SUBGRADE NATIVE SOIL:
COMPACT SUBGRADE NATIVE SOILS TO 95% STANDARD
PROCTOR DENSITY PER ASTM D696 FOR SOILS WITH CALIFORNIA BEARING RATIO
>20%, R VALUE >30, AASHTO A-1, A-2, AND A-3 SOILS.
NDS RECOMMENDS THAT ENGINEER-OF-RECORD CONSIDER HIGHER LEVEL OF COMPACTION FOR CBR 5 TO 20%, R-VALUE 10 TO 30, AASHTO
A-4 SOILS FOR HEAVY LOADS WHERE INFILTRATION INTO NATIVE SOILS IS NOT A REQUIREMENT.
NDS RECOMMENDS THAT ENGINEER-OF-RECORD CONSULT WITH PROJECT GEOTECHNICAL ENGINEER FOR POTENTIAL SOIL MODIFICATION
(E.G., LIME TREATMENT) AND COMPACTION LEVEL FOR CBR <5% AND R-VALUE <10, AASHTO A-5, A-6, AND A-7 SOILS.
TYPICAL SOIL COMPACTION TESTING LOACTIONS DETAIL NOT TO SCALE
DEWATERING DETAILS
N.T.S.
BASIN ACCESS DRIVE - PERMEABLE GRASS PAVER SURFACE DETAIL
STONE SIZE - USE 1-2 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
STONE SIZE - USE 1-2 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY). THICKNESS - NOT LESS THAN SIX (6) INCHES. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ON TO ROADWAYS. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE OR ADDITIONAL LENGTH AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHE OR TRACKED ON TO ROADWAYS (PUBLIC OR PRIVATE) OR OTHER IMPERVIOUS SURFACES MUST BE REMOVED IMMEDIATELY. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. WHERE ACCUMULATION OF DUST/SEDIMENT IS INADEQUATELY CLEANED OR REMOVED BY CONVENTIONAL METHODS, A POWER BROOM OR STREET SWEEPER WILL BE REQUIRED TO CLEAN PAVED OR IMPERVIOUS SURFACES. ALL OTHER ACCESS POINTS WHICH ARE NOT STABILIZED SHALL BE BLOCKED OFF.
STABILIZED CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE
STABILIZED CONSTRUCTION ENTRANCE REQUIREMENTS
WHERE A STABILIZED CONSTRUCTION EXIT TRAVERSES BETWEEN TWO BUILDINGS, IT SHALL BE STONED THE ENTIRE LENGTH OF THE RIGHT-OF-WAY. MOUNTABLE STONE BERMS PLACED ACROSS THE WIDTH OF THE EXIT MAY ALSO BE REQUIRED AT THE TRANSITION POINT BETWEEN PAVED AND NON-PAVED AREAS TO TRAP SEDIMENTS WHICH ARE CARRIED BY STORMWATER FLOWING ALONG THE CURBLINE.
INDIVIDUAL LOT ENTRANCE AND EGRESS- AFTER INTERIOR ROADWAYS ARE PAVED, INDIVIDUAL LOT INGRESS/EGRESS POINTS MAY REQUIRE A STABILIZED CONSTRUCTION ENTRANCE CONSISTING OF NO. 3 STONE (1" TO 2") TO PREVENT OR MINIMIZE TRACKING OF SEDIMENTS. WIDTH OF THE STONE INGRESS/EGRESS SHALL BE EQUAL TO LOT ENTRANCE WIDTH AND SHALL BE A MINIMUM OF TEN FEET IN LENGTH
TIRE WASHING - IF SPACE IS LIMITED, VEHICLE TIRES MAY BE WASHED WITH CLEAN WATER BEFORE ENTERING A PAVED AREA. A WASH STATION MUST BE LOCATED SUCH THAT WASH WATER WILL NOT FLOW ONTO PAVED ROADWAYS OR INTO UNPROTECTED STORM DRAINAGE SYSTEMS.
WHEN THE CONSTRUCTION ACCESS EXITS ONTO A MAJOR ROADWAY, A PAVED TRANSITION AREA MAY BE INSTALLED BETWEEN THE MAJOR ROADWAY AND THE STONED ENTRANCE TO PREVENT LOOSE STONES FROM BEING TRANSPORTED OUT ONTO THE ROADWAY BY HEAVY EQUIPMENT ENTERING OR LEAVING THE SITE.
TREE PROTECTION DETAIL NOT TO SCALE
EROSION CONTROL MATTING DETAIL
1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12" (30CM) OF RECPS EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE RECPS.
ROLL THE RECPS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE. RECPS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE.
THE EDGES OF PARALLEL RECPS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5-12.5CM) OVERLAP DEPENDING ON THE RECPS TYPE. CONSECUTIVE RECPS SPLICED DOWN THE SLOPE MUST BE END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30CM) APART ACROSS ENTIRE RECPS WIDTH.
IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP'S.
STANDARD FOR MAINTAINING VEGETATION
DEFINITION
THE PERPETUATION OF VEGETATIVE COVER.
PURPOSE
TO ENSURE THE CONTINUING VIGOR AND FUNCTION OF VEGETATIVE COVER AND ENHANCE THE ENVIRONMENT. IT IS USUALLY LESS COSTLY TO CARRY ON A MAINTENANCE PROGRAM THAN IT IS TO MAKE REPAIRS AFTER AN EXTENDED PERIOD OF NEGLECT.
WATER QUALITY ENHANCEMENT
ENSURES ADEQUATE PERMANENT COVER AND PREVENTS EXPOSURE OF SOILS TO EROSION AND OFF SITE SEDIMENTATION FROM STORMWATER RUNOFF IMPACTS. WHERE APPLICABLE ON AREAS WHERE EXISTING VEGETATION PROTECTS OR ENHANCES THE ENVIRONMENT.
METHODS AND MATERIALS
A PREVENTIVE MAINTENANCE PROGRAM ANTICIPATES REQUIREMENTS AND ACCOMPLISHES WORK WHEN IT CAN BE DONE WITH LEAST EFFORT AND EXPENSE TO INSURE ADEQUATE VEGETATIVE COVER.
MAINTENANCE SHOULD OCCUR ON A REGULAR BASIS, CONSISTENT WITH FAVORABLE PLANT GROWTH, SOIL, AND CLIMATIC CONDITIONS. THIS INVOLVES REGULAR SEASONAL WORK FOR MOWING, FERTILIZING, LIMING, WATERING, PRUNING, FIRE CONTROL, WEED AND PEST CONTROL, RESEEDING AND TIMELY REPAIRS.
THE DEGREE OF PREVENTIVE MAINTENANCE NEEDED DEPENDS UPON THE TYPE OF VEGETATION AND ITS PROPOSED FUNCTION OR USE.
MOWING IS A RECURRING PRACTICE AND ITS INTENSITY DEPENDS UPON THE FUNCTION OF THE GROUND COVER. ON HIGH TO MODERATE (A TO B) MAINTENANCE AREAS, SUCH AS LAWNS, CERTAIN RECREATION FIELDS, AND PICNIC AREAS, MOWING WILL BE FREQUENT (2 TO 7 DAY INTERVALS) AND TYPICALLY AT A HEIGHT OF 2.5 TO 3 INCHES. RETURN CLIPPINGS FROM MOWING (MULCHING MOWER) TO THE TURF TO REDUCE THE AMOUNT OF FERTILIZER NEEDED TO MAINTAIN THE TURF BY AS MUCH AS 50%. SOME TURF MIXTURES CAN BE MANAGED AS NATURALIZED STANDS REQUIRING ONLY ONE (COOL SEASON MIXTURES) OR TWO (WARM SEASON MIXTURES) MOWINGS PER YEAR. MOWING OF NATURALIZED AREAS IS TYPICALLY DONE AT HEIGHTS NO LESS THAN 4 INCHES AND SHOULD NOT BE DONE BETWEEN APRIL 1ST AND JULY 15TH TO AVOID DISTURBING GROUND NESTING BIRDS. THE LARGE AMOUNT OF CLIPPING DEBRIS GENERATED BY MOWING NATURALIZED AREAS WILL NEED TO BE REMOVED AND/OR DISPERSED SO THE VEGETATION IS NOT SMOTHERED. BURNING OF NATURALIZED AREAS IS ANOTHER PROCEDURE USED TO MANAGE NATURALIZED TURFS. LOW MAINTENANCE (D) AREAS MAY BE LEFT UNMOWED TO PERMIT NATURAL SUCCESSION. SEE PG. 4-13 FOOTNOTE #4, MAINTENANCE LEVELS A, B, C AND D IN THE STANDARD FOR PERMANENT VEGETATIVE COVER, TABLE 4-3.
INCORPORATION OF ORGANIC MATTER (FOR EXAMPLE, MATURE COMPOST) INTO THE SOIL WILL SUBSTANTIALLY REDUCE THE NEED FOR FERTILIZER AND IBRIGATION INPUTS
FERTILIZER AND LIME SHOULD BE APPLIED AS NEEDED TO MAINTAIN A DENSE STAND OF DESIRABLE SPECIES. FREQUENTLY MOWED AREAS AND THOSE ON SANDY SOILS WILL REQUIRE MORE FREQUENT FERTILIZATION BUT AT LOWER NUTRIENT RATES PER APPLICATION. 3-1 STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL IN NEW JERSEY JANUARY 2014.
LIME REQUIREMENT SHOULD BE DETERMINED BY SOIL TESTING EVERY 2 OR 3 YEARS. FERTILIZATION MAY INCREASE THE NEED FOR LIMING. CONTACT THE LOCAL COUNTY EXTENSION OFFICE FOR DETAILS ON SOIL TESTING AND FERTILIZATION AND PEST CONTROL RECOMMENDATIONS ONLINE AT HTTP://NJAES.RUTGERS.EDU/COUNTY/.
FERTILIZATION AND ADDITIONS OF OTHER SOIL AMENDMENTS ARE NOT RECOMMENDED FOR MANAGING NATIVE VEGETATION SUCH AS IN THE PINELANDS NATIONAL RESERVE. SEE THE STANDARD FOR PERMANENT VEGETATIVE STABILIZATION FOR SPECIFIC REQUIREMENTS IN THE PNR.
WEED INVASION MAY RESULT FROM ABUSIVE MOWING AND FROM INADEQUATE FERTILIZING AND LIMING. MANY NEWLY ESTABLISHED GRASSES WILL NOT SURVIVE IF MOWED AT HEIGHTS BELOW 2.5 INCHES AND AT INTERVALS GREATER THAN 7 DAYS. BRUSH INVASION IS A COMMON CONSEQUENCE OF LACK OF MOWING. THE AMOUNT OF WEEDS OR BRUSH THAT CAN BE TOLERATED IN ANY VEGETATED AREA DEPENDS UPON THE INTENDED USE OF THE LAND. DRAINAGE WAYS ARE SUBJECT TO RAPID INFESTATION BY WEED AND WOODY PLANTS. THESE SHOULD BE CONTROLLED, SINCE THEY OFTEN REDUCE DRAINAGE WAY EFFICIENCY. CONTROL OF WEEDS OR BRUSH IS ACCOMPLISHED BY USING HERBICIDES OR MECHANICAL METHODS.
FIRE HAZARD IS GREATER WHERE DRY VEGETATION HAS ACCUMULATED. THE TALLER THE VEGETATION, THE GREATER THE HAZARD.
PRUNE TREES AND SHRUBS TO REMOVE DEAD OR DAMAGED BRANCHES. REMOVE UNDESIRABLE OR OR INVASIVE PLANTS TO MAINTAIN INTEGRITY OF THE LANDSCAPE AND ENHANCE QUALITY OF PERMANENT VEGETATIVE COVER.
NOTES:
4"-6" STRIPPING DEPTH IS COMMON (BUT MAY VARY). STOCKPILES SHOULD BE SITUATED SO AS NOT TO OBSTRUCT NATURAL DRAINAGE OR CAUSE OFFSITE ENVIRONMENTAL DAMAGE. STOCKPILES SHOULD BE VEGETATED IN ACCORDANCE WITH STANDARDS DESCRIBED HEREIN. REFER TO TEMPORARY OR PERMANENT VEGETATIVE COVER FOR SOIL STABILIZATION.
STOCKPILES NOT TO BE PLACED IN AREA WITH CONCENTRATED FLOW, WETLANDS, EXTREME SLOPE OR WITHIN 100 FT OF A NATURAL STREAM.
TOPSOIL STOCKPILE DETAIL NOT TO SCALE
METAL WIRE FENCING
NOTES:
GEOTEXTILE TO BE FASTENED SECURELY TO FENCE POST BY USING WIRE TIES OR HOG RINGS. USE 4 TO 6 FASTENERS PER POST.
FENCE POSTS SHALL BE SPACED 8 FEET CENTER-TO-CENTER OR CLOSER. THEY SHALL EXTEND AT LEAST 2 FEET INTO THE GROUND AND EXTEND AT LEAST 2 FEET ABOVE GROUND. POSTS SHALL BE CONSTRUCTED OF HARDWOOD WITH A MINIMUM DIAMETER THICKNESS OF 11/2.
SPLICING OF INDIVIDUAL ROLLS SHALL NOT OCCUR AT LOW POINTS.
ALL SILT FENCE TO BE INSPECTED AND REMEDIAL MAINTENANCE PERFORMED BY THE CONTRACTOR WITHIN 24 HOURS AFTER EACH RAINFALL. REMOVE THE SILT ACCUMULATION WHEN IT REACHES I/3 OF THE FENCE FABRIC HEIGHT.
FOR EVERY 100 FEET OF SILT FENCE, OR 1/4 ACRE OF DRAINAGE AREA, PROVIDE AN OVERFLOW POINT TO REDUCE PONDING IN FRONT OF THE FENCE.
FENCE POSTS SHALL BE SPACED 8 FEET CENTER-TO-CENTER OR CLOSER. THEY SHALL EXTEND AT LEAST 2 FEET INTO THE GROUND AND EXTEND AT LEAST 2 FEET ABOVE GROUND. POSTS SHALL BE CONSTRUCTED OF HARDWOOD WITH A MINIMUM DIAMETER THICKNESS OF 11/2. "SUPER" SILT FENCE- A METAL FENCE WITH 6 INCH OR SMALLER MESH OPENINGS AND AT LEAST 2 FEET HIGH MAY BE UTILIZED, FASTENED TO THE FENCE POSTS, TO PROVIDE REINFORCEMENT AND SUPPORT TO THE GEOTEXTILE FABRIC. POSTS MAY BE SPACED LESS THAN 8 FEET ON CENTER AND MAY BE CONSTRUCTED OF HEAVIER WOOD OR METAL AS NEEDED TO WITHSTAND HEAVIER SEDIMENT LOADING. THIS PRACTICE IS APPROPRIATE WHERE SPACE FOR OTHER PRACTICES IS LIMITED AND HEAVY SEDIMENT LOADING IS EXPECTED. "SUPER" SILT FENCE IS NOT TO BE USED IN PLACE OF PROPERLY DESIGNED DIVERSIONS WHICH MAY BE NEEDED TO CONTROL SURFACE RUNOFF RATES AND VELOCITIES.
A GEOTEXTILE FABRIC, RECOMMENDED FOR SUCH USE BY MANUFACTURER, SHALL BE BURIED AT LEAST 6 INCHES DEEP IN THE GROUND. THE FABRIC SHALL EXTEND AT LEAST 2 FEET ABOVE THE GROUND. THE FABRIC MUST BE SECURELY FASTENED TO THE POSTS USING A SYSTEM CONSISITING OF METAL FASTENERS (NAILS OR STAPLES) AND A HIGH STRENGTH REINFORCEMENT MATERIAL (NYLON WEBBING, GROMMETS, WASHERS ETC.) PLACED BETWEEN THE FASTENERS AND THE GEOTEXTILE FABRIC. THE FASTENING SYSTEM SHALL RESIST TEARING AWAY FROM THE POST. THE FABRIC SHALL INCORPORATE A DRAWSTRING IN THE TOP PORTION OF THE FENCE FOR ADDED STRENGTH.
ADDED STRENGTH Q "SLIDER" SILT FI
"SUPER" SILT FENCE SHALL INCLUDE WIRE FENCE BEHIND FABRIC.
SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM FACE OF THE BARRIER WHEN IT HAS REACHED A DEPTH OF 1/2 THE BARRIER HEIGHT.
REPAIR OR REPLACE BARRIER (FABRIC, POSTS, BALES, ETC.) WHEN DAMAGED.
BARRIERS SHALL BE INSPECTED DAILY FOR SIGNS OF DETERIORATION AND SEDIMENT REMOVAL.
SUPER SILT FENCE (WITH WIRE FENCE) DETAIL NOT TO SCALE
STREE
NOTES:
MAINTENANCE, REPAIR AND REPLACEMENT SHALL BE MADE PROMPTLY, AS NEEDED.
THE BARRIER SHALL BE REMOVED WHEN THE AREA DRAINING TOWARDS THE INLET HAS BEEN STABILIZED.
INSPECTIONS SHALL BE FREQUENT.
INLET PROTECTION DETAIL NOT TO SCALE
REVISED PER AGENCY COMMENTS 01/15/26 ZF
REVISED PER COUNTY AND SCD COMMENTS 07/31/25 ZF
REVISED PER COUNTY AND SCD COMMENTS 06/05/25 ZF
NO. REVISION DATE BY
ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ENGINEER AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF THE ENGINEER.
CONSULTING
CIVIL CORE CONSULTING, LLC 1969 RUTGERS UNIVERSITY BLVD. LAKEWOOD, NJ 08701
NJ CERTIFICATE OF AUTHORIZATION NO. 24GA28399400
PROJECT: PRELIMINARY & FINAL MAJOR SITE PLAN FOR
BLOCK 22401, LOT 7-12 LOCATION:
JACKSON TOWNSHIP OCEAN COUNTY NEW JERSEY
DRAWING TITLE:
SOIL EROSION AND SEDIMENT CONTROL DETAILS
PROJECT NO.DATEDRAWN BYCHECKED BY
2308901/22/25HHYP
STATE OF NEW JERSEY SEF PORT NO. No GE55583 DIGITALY SIGNED BY Yosef Portnoy Date: 2026.01.19 11:35:13-05'00' SCALE AS NOTED
SHEET NO. 15 OF
LICENSED PROFESSIONAL ENGINEER NJ LICENSE NO: GE53593 24
YOSEF PORTNOY