ordinance and the Pinelands
Comprehensive Management Plan
(CMP). The applicant proposes
demolition of this building and
revegetation of the concerned areas
in accordance with the submitted
restoration plan to address the
violation.
The parcel is located adjacent to the main stem of the Toms River. The Township has adopted, and the Commission has certified, Township Ordinance 27-05, implementing “A Regional Natural Resource Protection Plan for the Toms River Corridor” to protect threatened and endangered plants and threatened and endangered animal habitat. That Plan requires a 600 foot buffer to the main stem of the Toms River and Ridgeway Branch.
capable of reducing total nitrogen in the wastewater so that the proposed development can meet the 2ppm nitrogen groundwater quality (septic dilution) standard of the Jackson Township land use ordinance and the CMP at the property line of the parcel.
8. Item(s) on the attached inconsistencies document must be resolved prior to Commission issuance of a letter indicating that any approvals or permits can take effect.
NEXT STEPS