| Project Details | |
| Work Type | Widening |
|---|---|
| Phase | Design |
| Limits | From N of Sportsman Point to E Arlington Street |
| Length | 0.8 miles |
| City | Inverness |
| County | Citrus |
| Road | Florida Avenue (Citrus) US 41 |
Contact Information
Design Manager Eyra Cash 813-975-6164 Eyra.Cash@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
The purpose of this project is to reconstruct and widen US 41 from the existing 2 lanes to a 4-lane road with median separation. It includes bike lanes and sidewalks and a new pond site.
The project is currently in the design phase. Construction is currently anticipated to begin late 2028.