Jackson Township Planning Board
-7-
The Site Plan prepared by NES details a 1-way egress driveway on Farmingdale Road for School "A" as well as a 2-way driveway to Pfister Road and two 1-way driveways to Pfister Road for School "B" and School "C" with separate parking areas and school bus queuing areas for each of the 3 schools. Queuing areas for a minimum of 2 school buses are provided for each of the 3 schools. Parking has been provided for each of the schools in accordance with anticipated staffing and parent drop-offs/pick-ups for the approximate 10 percent of students that will arrive and depart via private automobile. The total parking supply of 177 spaces exceeds the Jackson Township ordinance requirement of 171 parking spaces.
The following represents a summary of the findings contained in this Traffic Impact Analysis:
The site driveways to Farmingdale Road and Pfister Road will operate at an acceptable level of service for the 2032 design year.
Each school site has been designed to provide positive on-site circulation, bus queuing and adequate parking that meets and exceeds the Township recommendation.
The realigned Pfister Road intersection with Farmingdale Road is projected to operate at level of service “B” for both peak hours analyzed.
A representative of MRA will be in attendance at an upcoming Jackson Township Planning Board meeting to provide expert testimony and answer any questions Board members, Board experts or the public may have.
Very truly yours,
Very truly yours,
John H. Rea, PE
Principal
cc: Moshe Hoffman
Rikki Greenwald
Chaim Brownstein
Donna Jennings, Esq.
Scott T. Kennel
Sr. Associate