| HCS Two-Way Stop-Control Report |
| General Information | Site Information |
| Analyst | STK | Intersection | SCHOOL' B' & PFISTER |
|---|
| Agency/Co | MRA | Jurisdiction | |
|---|
| Date Performed | 1/7/26 | East/West Street | SCHOOL' B' |
|---|
| Analysis Year | 2035 | North/South Street | PFISTER ROAD |
|---|
| Time Analyzed | PM | Peak Hour Factor | 0.90 |
|---|
| Intersection Orientation | North-South | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 22-210PFB-5 BUILD |
|---|
| Lanes |
 |
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
|---|
| Movement | U | L | T | R | U | L | R | U | L | T | R | U | L | R |
|---|
| Priority | | 10 | 11 | 12 | | 7 | 8 | 9 | 1U | 1 | 2 | 3 | 4U | 4 |
|---|
| Number of Lanes | | 0 | | 10 | | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
|---|
| Configuration | | | LR | | | | | | LT | | | | | TR |
|---|
| Volume (veh/m) | | 0 | | 5 | | | | | 3 | 35 | | | | 26 |
|---|
| Percent Heavy Vehicles (%) | | 3 | | 3 | | | | | 3 | | | | | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | 0 | |
|---|
| Right Turn Channelized | | |
|---|
| Median Type | Storage | Undivided |
|---|
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | 7.1 | | 6.2 | | | | | | 4.1 | | | | | |
|---|
| Critical Headway (sec) | 16.43 | | 6.23 | | | | | | 2.15 | | | | | |
|---|
| Base Follow-Up Headway (sec) | 3.5 | | 3.3 | | | | | | 2.2 | | | | | |
|---|
| Follow-Up Headway (sec) | 3.53 | | 3.3 | | | | | | 2.2 | | | | | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | 6 | | | | | | | 6 | | | | | |
|---|
| Capacity (c (veh/h)) | | 1043 | | | | | | | 1578 | | | | | |
|---|
| v/c Ratio | | 0.01 | | | | | | | 0.00 | | | | | |
|---|
| 95% Queue Length Qas (veh) | | 0.0 | | | | | | | 0.0 | | | | | |
|---|
| 95% Queue Length Qas (ft) | | 0.0 | | | | | | | 0.0 | | | | | |
|---|
| Control Delay (s/veh) | | 8.5 | | | | | | | 7.0 | 0.0 | | | | |
|---|
| Level of Service (LOS) | | A | | | | | | | A | A | | | | |
|---|
| Approach Delay (s/veh) | 8.5 | | 0.9 | |
|---|
| Approach LOS | A | | A | |
|---|
Copyright © 2026 University of Florida. All Rights Reserved.