| HCS Two-Way Stop-Control Report |
| General Information | Site Information |
| Analyst | STK | Intersection | FARM. & SCHOOL'A' |
|---|
| Agency/Co | MRA | Jurisdiction | |
|---|
| Date Performed | 1/7/26 | East/West Street | FARMINGDALE RD |
|---|
| Analysis Year | 2035 | North/South Street | SGHOOL A |
|---|
| Time Analyzed | PM | Peak Hour Factor | 0.90 |
|---|
| Intersection Orientation | East-West | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 22-210PFB-3 BUILD |
|---|
| Lanes |
 |
| Major Street: East-West |
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
|---|
| Movement | U | L | T | R | U | L | R | U | L | R | U | L | T | R |
|---|
| Priority | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 | | 7 | 8 | 9 | | 12 |
|---|
| Number of Lanes | 0 | 0 | 1 | 0 | 0 | 0 | 1 | 0 | | 0 | 0 | 0 | | 0 |
|---|
| Configuration | | | T | | | | T | | | | | | LR | |
|---|
| Volume (veh/h) | | | 256 | | | | 136 | | | | | | 1 | |
|---|
| Percent Heavy Vehicles (%) | | | | | | | | | | | | | 3 | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | | | | | | | | | | | | | |
|---|
| Right Turn Channelized | | | | | | | | | | | | 0 |
|---|
| Median Type | Storage | Undivided |
|---|
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | | | | | | | | | | | | 7.1 | |
|---|
| Critical Headway (sec) | | | | | | | | | | | | | 6.4 | |
|---|
| Base Follow-Up Headway (sec) | | | | | | | | | | | | | 3.5 | |
|---|
| Follow Up Headway (sec) | | | | | | | | | | | | | 3.5 | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | | | | | | | | | | | | | 2 |
|---|
| Capacity, c (veh/h) | | | | | | | | | | | | | | 7.00 |
|---|
| v/c Ratio | | | | | | | | | | | | | | 0.00 |
|---|
| 95% Queue Length, Qs (veh) | | | | | | | | | | | | | | 0.00 |
|---|
| 95% Queue Length, Qas (ft) | | | | | | | | | | | | | | 0.0 |
|---|
| Control Delay (s/wk) | | | | | | | | | | | | | | 102 |
|---|
| Level of Service (LOS) | | | | | | | | | | | | | | B |
|---|
| Approach Delay (s/wh) | | | | | | | | | | | | | 102 |
|---|
| Approach LOS | | | | | | | | | | | | | B |
|---|