| HCS Two-Way Stop-Control Report | ||||||||||||||
| General Information | Site Information | |||||||||||||
| Analyst | STK | Intersection | FARM. & PFISTER | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Agency Co. | MRA | Jurisdiction | ||||||||||||
| Date Performed | 1/7/26 | East/West Street | FARMINGDALE RD | |||||||||||
| Analysis Year | 2035 | North/South Street | PFISTER ROAD | |||||||||||
| Time Analyzed | PM | Peak Hour Factor | 0.90 | |||||||||||
| Intersection Orientation | East-West | Analysis Time Period (hrs) | 0.25 | |||||||||||
| Project Description | 22-210PFB-1 BUILD-MIT | |||||||||||||
| Lanes | ||||||||||||||
![]() | ||||||||||||||
| Vehicle Volumes and Adjustments | ||||||||||||||
| Approach | Eastbound | Westbound | Northbound | Southbound | ||||||||||
| Movement | U | L | T | E | U | L | R | U | L | R | U | L | R | |
| Priority | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| Number of Lanes | 0 | 1 | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 0 | 0 | 1 | 0 |
| Configuration | L | TR | L | TR | LTR | LTR | ||||||||
| Volume (veh/h) | 12 | 80 | 170 | 25 | 65 | 21 | 61 | 12 | 20 | 12 | 12 | |||
| Percent Heavy Vehides (%) | 3 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||
| Proportion Time Blocked | ||||||||||||||
| Percent Grade (%) | 0 | 0 | ||||||||||||
| Right Turn Channelized | ||||||||||||||
| Median Type | Storage | Undivided | |||||||||||||
| Critical and Follow-up Headways | ||||||||||||||
| Base Critical Headway (sec) | 4.1 | 4.1 | 7.1 | 6.5 | 6.2 | 7.1 | 6.5 | |||||||
| Critical Headway (sec) | 1.13 | 4.13 | 7.13 | 6.63 | 6.23 | 7.13 | 6.53 | |||||||
| Base Follow-Up Headway (sec) | 2.2 | 2.2 | 3.5 | 4.0 | 3.3 | 3.5 | 4.0 | |||||||
| Follow Up Headway (sec) | 2.23 | 2.23 | 3.53 | 4.03 | 3.33 | 3.53 | 4.03 | |||||||
| Delay Queue Length and Level of Service | ||||||||||||||
| Flow Rate, v (veh/h) | 13 | 26 | 103 | 38 | ||||||||||
| Capacity (v/v/h) | 1492 | 1279 | 602 | 602 | ||||||||||
| v/c Ratio | 0.01 | 0.02 | 0.17 | 0.06 | ||||||||||
| 95% Queue Length Q95 (veh) | 0.0 | 0.1 | 0.5 | 0.2 | ||||||||||
| 95% Queue Length Q95 (ft) | 0.0 | 2.6 | 15.4 | 5.1 | ||||||||||
| Control Delay (s/veh) | 7.3 | 7.9 | 12.2 | 11.4 | ||||||||||
| Level of Service (LOS) | A | A | B | B | ||||||||||
| Approach Delay (s/veh) | 0.3 | 1.7 | 12.2 | 11.4 | ||||||||||
| Approach LOS | A | A | B | B | ||||||||||
Copyright © 2026 University of Florida. All Rights Reserved.