| HCS Two-Way Stop-Control Report | |
| General Information | Site Information | |
| Analyst | STK | Intersection | FARM. & PFISTER | |
|---|
| Agency Co. | MRA | Jurisdiction | | |
|---|
| Date Performed | 1/7/26 | East/West Street | FARMINGDALE RD | |
|---|
| Analysis Year | 2035 | North/South Street | PFISTER ROAD | |
|---|
| Time Analyzed | PM | Peak Hour Factor | 0.90 | |
|---|
| Intersection Orientation | East-West | Analysis Time Period (hrs) | 0.25 | |
|---|
| Project Description | 22-210PFB-1 BUILD-MIT | |
|---|
| Lanes | |
 | |
| Vehicle Volumes and Adjustments | |
| Approach | Eastbound | Westbound | Northbound | Southbound | |
|---|
| Movement | U | L | T | E | U | L | R | U | L | R | U | L | R | |
|---|
| Priority | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
|---|
| Number of Lanes | 0 | 1 | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 0 | 0 | 1 | 0 |
|---|
| Configuration | | L | | TR | | L | | TR | | LTR | | | LTR | |
|---|
| Volume (veh/h) | | 12 | 80 | 170 | | 25 | 65 | 21 | | 61 | 12 | 20 | 12 | 12 |
|---|
| Percent Heavy Vehides (%) | | 3 | | | | 3 | | | 3 | 3 | 3 | | 3 | 3 |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | | | | | | | | | 0 | | | 0 | |
|---|
| Right Turn Channelized | | | | | | | | | | | | | | |
|---|
| Median Type | Storage | Undivided | |
|---|
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | 4.1 | | | | 4.1 | | | 7.1 | 6.5 | 6.2 | | 7.1 | 6.5 |
|---|
| Critical Headway (sec) | | 1.13 | | | | 4.13 | | | 7.13 | 6.63 | 6.23 | | 7.13 | 6.53 |
|---|
| Base Follow-Up Headway (sec) | | 2.2 | | | | 2.2 | | | 3.5 | 4.0 | 3.3 | | 3.5 | 4.0 |
|---|
| Follow Up Headway (sec) | | 2.23 | | | | 2.23 | | | 3.53 | 4.03 | 3.33 | | 3.53 | 4.03 |
|---|
| Delay Queue Length and Level of Service |
| Flow Rate, v (veh/h) | | 13 | | | | 26 | | | | 103 | | | | 38 |
|---|
| Capacity (v/v/h) | | 1492 | | | | 1279 | | | | 602 | | | | 602 |
|---|
| v/c Ratio | | 0.01 | | | | 0.02 | | | | 0.17 | | | | 0.06 |
|---|
| 95% Queue Length Q95 (veh) | | 0.0 | | | | 0.1 | | | | 0.5 | | | | 0.2 |
|---|
| 95% Queue Length Q95 (ft) | | 0.0 | | | | 2.6 | | | | 15.4 | | | | 5.1 |
|---|
| Control Delay (s/veh) | | 7.3 | | | | 7.9 | | | | 12.2 | | | | 11.4 |
|---|
| Level of Service (LOS) | | A | | | | A | | | | B | | | | B |
|---|
| Approach Delay (s/veh) | | 0.3 | | | | 1.7 | | | 12.2 | | | | 11.4 | |
|---|
| Approach LOS | | A | | | | A | | | B | | | B | | |
|---|