HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersectionFARM. & PFISTER
Agency Co.MRAJurisdiction
Date Performed1/7/26East/West StreetFARMINGDALE RD
Analysis Year2035North/South StreetPFISTER ROAD
Time AnalyzedPMPeak Hour Factor0.90
Intersection OrientationEast-WestAnalysis Time Period (hrs)0.25
Project Description22-210PFB-1 BUILD-MIT
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTEULRULRULR
Priority1U1234U456789101112
Number of Lanes01100110010010
ConfigurationLTRLTRLTRLTR
Volume (veh/h)12801702565216112201212
Percent Heavy Vehides (%)3333333
Proportion Time Blocked
Percent Grade (%)00
Right Turn Channelized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)4.14.17.16.56.27.16.5
Critical Headway (sec)1.134.137.136.636.237.136.53
Base Follow-Up Headway (sec)2.22.23.54.03.33.54.0
Follow Up Headway (sec)2.232.233.534.033.333.534.03
Delay Queue Length and Level of Service
Flow Rate, v (veh/h)132610338
Capacity (v/v/h)14921279602602
v/c Ratio0.010.020.170.06
95% Queue Length Q95 (veh)0.00.10.50.2
95% Queue Length Q95 (ft)0.02.615.45.1
Control Delay (s/veh)7.37.912.211.4
Level of Service (LOS)AABB
Approach Delay (s/veh)0.31.712.211.4
Approach LOSAABB