HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersectionFARM. & PFISTER
Agency/CoMRAUnsidiction
Date Performed1/7/26East/West StreetFARMINGDALE RD
Analysis Year2035North/South StreetPFISTER ROAD
Time AnalyzedAMPeak Hour Factor0.90
Intersection OrientationEast-WestAnalysis Time Period (hrs)0.25
Project Description22-210AFB-1 BUILD-MIT
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTRUTRUTRUTR
Priority1U1234U456789101112
Number of Lanes01100100010010
ConfigurationLTRLTRLTRLTR
Volume (veh/h)366955670488249204139
Percent Heavy Vehides (%)3333333
Proportion Time Blocked
Percent Grade (%)
Right Turn Channelized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)4.14.17.16.56.27.1
Critical Headway (sec)4.14.17.16.56.27.1
Base Follow-Up Headway (sec)2.22.23.54.03.33.5
Follow-Up Headway (sec)2.22.23.54.03.33.5
Delay Queue Length and Level of Service
Flow Rate, v (veh/h)407168116
Capacity (veh/h)14481440578601
v/c Ratio0.030.000.290.19
95% Queue Length Q95 (ft)0.10.00120.7
95% Queue Length Q95 (ft)2.60.030.717.9
Control Delay (s/veh)7.673.812.4
Level of Service (LOS)AABB
Approach Delay (s/veh)170.413.812.4
Approach LOSAABB