HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersectionFARM. & NEW PROSPECT
Agency/CoMRAJurisdiction
Date Performed9/29/2022East/West StreetFARMINGDALE RD
Analysis Year2022North/South StreetNEW PROSPECT ROAD
Time AnalyzedAMPeak Hour Factor0.90
Intersection OrientationEast-WestAnalysis Time Period (hrs)0.25
Project Description22-210AE-2 EXIST
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTRULTRULTRULT
Priority1U1234U4567891011
Number of Lanes0010001001000
ConfigurationTRLTLR
Volume (veh/h)72565758017
Percent Heavy Vehicles (%)333
Proportion Time Blocked
Percent Grade (%)
Right Turn Channelized0
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)4.17.16.2
Critical Headway (sec)4.136.436.23
Base Follow-Up Headway (sec)2.23.53.3
Follow-Up Headway (sec)2.233.533.33
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h)6108
Capacity, c (veh/h)1434802
v/c Ratio0.000.13
95% Queue Length, Q95 (veh)0.00.5
Control Delay (s/veh)7.50.010.2
Level of Service (LOS)AAB
Approach Delay (s/veh)0.510.2
Approach LOSAB

HCS™ TWSC Version 2023 22-210AE-2.xtw