| HCS Two-Way Stop-Control Report |
| General Information | Site Information |
| Analyst | STK | Intersection | FARM. & NEW PROSPECT |
|---|
| Agency/Co | MRA | Jurisdiction | |
|---|
| Date Performed | 9/29/2022 | East/West Street | FARMINGDALE RD |
|---|
| Analysis Year | 2022 | North/South Street | NEW PROSPECT ROAD |
|---|
| Time Analyzed | AM | Peak Hour Factor | 0.90 |
|---|
| Intersection Orientation | East-West | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 22-210AE-2 EXIST |
|---|
| Lanes |
 |
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
|---|
| Movement | U | L | T | R | U | L | T | R | U | L | T | R | U | L | T |
|---|
| Priority | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 | | 7 | 8 | 9 | | 10 | 11 |
|---|
| Number of Lanes | 0 | 0 | 1 | 0 | 0 | 0 | 1 | 0 | | 0 | 1 | 0 | | 0 | 0 |
|---|
| Configuration | | | | TR | | LT | | | | | LR | | | | |
|---|
| Volume (veh/h) | | | 72 | 56 | | 5 | 75 | | | 80 | | 17 | | | |
|---|
| Percent Heavy Vehicles (%) | | | | | | 3 | | | | 3 | | 3 | | | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | | | | | | | | | | | | | | |
|---|
| Right Turn Channelized | | | | | | | | | | 0 | | | | | |
|---|
| Median Type | Storage | Undivided |
|---|
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | | | | | 4.1 | | | | 7.1 | | 6.2 | | | |
|---|
| Critical Headway (sec) | | | | | | 4.13 | | | | 6.43 | | 6.23 | | | |
|---|
| Base Follow-Up Headway (sec) | | | | | | 2.2 | | | | 3.5 | | 3.3 | | | |
|---|
| Follow-Up Headway (sec) | | | | | | 2.23 | | | | 3.53 | | 3.33 | | | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | | | | | 6 | | | | | 108 | | | | |
|---|
| Capacity, c (veh/h) | | | | | | 1434 | | | | | 802 | | | | |
|---|
| v/c Ratio | | | | | | 0.00 | | | | | 0.13 | | | | |
|---|
| 95% Queue Length, Q95 (veh) | | | | | | 0.0 | | | | | 0.5 | | | | |
|---|
| Control Delay (s/veh) | | | | | | 7.5 | 0.0 | | | | 10.2 | | | | |
|---|
| Level of Service (LOS) | | | | | | A | A | | | | B | | | | |
|---|
| Approach Delay (s/veh) | | | | | | 0.5 | | | | 10.2 | | | | | |
|---|
| Approach LOS | | | | | | A | | | | B | | | | | |
|---|