Copyright © 2026 University of Florida. All Rights Reserved.
| Lanes |
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
|---|
| Movement | U | L | T | R | U | L | T | R | U | L | T | R | U | L | T | R | U | L |
|---|
| Priority | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 | | 7 | 8 | 9 | | 10 | 11 | 12 | | |
|---|
| Number of Lanes | 0 | 0 | 1 | 0 | 0 | 0 | 1 | 0 | | 0 | 0 | 0 | | 0 | 1 | 0 | | |
|---|
| Configuration | | LT | | | | | | TR | | | | | | | LR | | | |
|---|
| Volume (veh/h) | | 7 | 217 | | | | 112 | 20 | | | | | | | 13 | | 5 | |
|---|
| Percent Heavy Vehicles (%) | | 3 | | | | | | | | | | | | | 3 | | 3 | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | | | | | | | | | | | | | | | | | |
|---|
| Right Turn Channelized | | | | | | | | | | | | | | 0 |
|---|
| Median Type | Storage | Undivided | |
|---|
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | 4.1 | | | | | | | | | | | | | 7.1 | | 6.2 | |
|---|
| Critical Headway (sec) | | 4.13 | | | | | | | | | | | | | 6.43 | | 6.23 | |
|---|
| Base Follow-Up Headway (sec) | | 2.2 | | | | | | | | | | | | | 3.5 | | 3.3 | |
|---|
| Follow-Up Headway (sec) | | 2.23 | | | | | | | | | | | | | 3.53 | | 3.33 | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | 8 | | | | | | | | | | | | | | 20 | | |
|---|
| Capacity, c (veh/h) | | 1429 | | | | | | | | | | | | | | 668 | | |
|---|
| V/c Ratio | | 0.01 | | | | | | | | | | | | | | 0.03 | | |
|---|
| 95% Queue Length, Qas (veh) | | 0.0 | | | | | | | | | | | | | | 0.1 | | |
|---|
| 95% Queue Length, Qas (ft) | | 0.0 | | | | | | | | | | | | | | 2.6 | | |
|---|
| Control Delay (s/veh) | | 7.5 | 0.0 | | | | | | | | | | | | | 10.6 | | |
|---|
| Level of Service (LOS) | | A | A | | | | | | | | | | | | | B | | |
|---|
| Approach Delay (s/veh) | | 0.3 | | | | | | | | | | | | 10.6 |
|---|
| Approach LOS | A | | | | | | | | | | | | B |
|---|
| General Information | Site Information |
| Analyst | STK | Intersection | FARM. & PFISTER |
|---|
| Agency/Co. | MRA | Jurisdiction | |
|---|
| Date Performed | 9/29/2022 | East/West Street | FARMINGDALE RD |
|---|
| Analysis Year | 2022 | North/South Street | PFISTER ROAD |
|---|
| Time Analyzed | PM | Peak Hour Factor | 0.90 |
|---|
| Intersection Orientation | East-West | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 22-210PE-1 EXIST |
|---|