| HCS7 Two-Way Stop-Control Report | |
| General Information | Site Information | |
| Analyst | STK | Intersection | FARM. & PFISTER | |
|---|
| Agency/Co | MRA | Function | | |
|---|
| Date Performed | 9/29/2022 | East/West Street | FARMINGDALE RD | |
|---|
| Analysis Year | 2022 | North South Street | PFISTER ROAD | |
|---|
| Time Analyzed | AM | Peak Hour Factor | 0.90 | |
|---|
| Intersection Orientation | East West | Analysis Time Period (1h) | 0.25 | |
|---|
| Project Description | 22-210AE-1 EXIST | |
|---|
| Lanes | |
 | |
| Vehicle Volumes and Adjustments | |
| Approach | Eastbound | Westbound | Northbound | Southbound | |
|---|
| Movement | U | L | T | R | U | L | R | U | T | R | U | L | T | |
|---|
| Priority | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
|---|
| Number of Lanes | 10 | 10 | 11 | 10 | 10 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
|---|
| Configuration | | LT | | | | | TR | | | | | | LR | |
|---|
| Volume (veh/h) | | 1 | 104 | | | | 132 | 22 | | | | 24 | | 5 |
|---|
| Percent Heavy Vehides (%) | | 3 | | | | | | | | | | 3 | | 3 |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | | | | | | | | | | | | 0 | |
|---|
| Right Turn Channelized | | | | | | | | | | | | | | |
|---|
| Median Type | Storage | Undivided | |
|---|
| Critical and Follow-up Headways | |
| Base Critical Headway (sec) | | 4.1 | | | | | | | | | | 7.1 | | 6.2 |
|---|
| Critical Headway (sec) | | 4.1 | | | | | | | | | | 6.43 | | 6.23 |
|---|
| Base Follow-Up Headway (sec) | | 2.2 | | | | | | | | | | 3.5 | | 3.3 |
|---|
| Follow-Up Headway (sec) | | 2.2 | | | | | | | | | | 3.53 | | 3.35 |
|---|
| Delay Queue Length and Level of Service |
| Flow Rate, v (veh/h) | | 1 | | | | | | | | | | | 32 | |
|---|
| Capacity c (veh/h) | | 1395 | | | | | | | | | | | 73 | |
|---|
| v/c Ratio | | 0.00 | | | | | | | | | | | 0.04 | |
|---|
| 95% Queue Length, Qsc (veh) | | 0.0 | | | | | | | | | | | 0.1 | |
|---|
| Control Delay (s/veh) | | 7.6 | | | | | | | | | | | 10.1 | |
|---|
| Level of Service (LOS) | | A | | | | | | | | | | | 6 | |
|---|
| Approach Delay (s/veh) | 0.1 | | 10.1 |
|---|
| Approach LOS | | | | | | | | | | | | 8 |
|---|