Southwest Florida
Florida Department of Transportation
Bradenton-Palmetto Connector Project Development and Environment (PD&E) Study
444843-1
| Project Details |
| Work Type | New Road |
|---|
| Phase | PD&E |
|---|
| City | BradentonPalmetto |
|---|
| County | Manatee |
|---|
Contact Information
Planning Project Manager
Michelle Rutishauser
Michelle.Rutishauser@dot.state.fl.us
The Bradenton-Palmetto Connector proposes to provide additional capacity and improve mobility over the Manatee River, specifically between the Cities of Bradenton and Palmetto. A total three (3) corridors were evaluated during the Project Development and Environment (PD&E) Study. A proposed Preferred Alternative will be presented at the Public Hearing.
Specific right-of-way needs will be determined during the subsequent design phase, with any potential acquisition occurring during the project's right-of-way phase.