Page 6

REQUIRED R-20REQUIRED R-1PROPOSED NEW LOT 31.01STATUS
Side Yard Setback15 ft20 ft± 10 ft (EV)(9)Pre-Existing Non-Conforming Condition

V – Variance N/A – Not Applicable TBD – To Be Determined

Note:

  1. For New Lot 20.01: Per §244-47D new lots created by subdivision after the date of this section should comply with the R-3 zoning standards unless connected to public sewer. New Lot 20.01 is serviced by an on-site septic system, therefore is required to meet the R-3 Zone requirements.
  2. For New Lot 31.01: The most restrictive zone is the R-1 Zone. The proposed dwelling located on New Lot 31.01 encroaches into the R-1 Zone; therefore, the chart above reflects the relief required based on the R-1 Zone bulk requirements.
  3. Per §244-46D the minimum lot area is 130,000 sf, whereas 43,871.91 sf is proposed for New Lot 20.01.
  4. Per §244-46D the minimum lot width is 200 ft, whereas 101.09 ft is provided for New Lot 20.01.
  5. Per §244-46D the minimum front yard setback is 80 ft, whereas 54.8 ft is a pre-existing non-conforming condition for New Lot 20.01.
  6. Per §244-46D the minimum side yard setback is 50 ft, whereas 21.4 ft is a pre-existing non-conforming condition for New Lot 20.01.
  7. Per §244-46D the minimum side yard setback for an accessory garage is 50 ft, whereas 10.6 ft is a pre-existing non-conforming condition for the existing garage on New Lot 20.01.
  8. Per §244-46D the minimum side yard setback for an accessory pool is 50 ft, whereas 29.2 ft is a pre-existing non-conforming condition for the above ground pool on New Lot 20.01.
  9. Per §244-47D the minimum lot width is 150 ft, whereas 100 ft is provided on New Lot 31.01.
  10. Per §244-47D the minimum side yard setback for an accessory shed is 15 ft, whereas 1.7 ft is a pre-existing non-conforming condition for the existing shed on New Lot 31.01.
  11. Per §244-47D the minimum side yard setback for an accessory pool is 20 ft, whereas approximately 10 ft is a pre-existing non-conforming condition for the inground pool on New Lot 31.01.

IV. SUBDIVISION PLAN ISSUES

With the exception of the following, Plan issues are deferred to the Board Engineer.

  • The Applicant should provide testimony to discuss any previous approvals, and any relief granted for the site.
  • The Applicant should provide testimony to discuss the purpose of the proposed subdivision.
  • The Applicant should provide testimony to discuss the proposed configuration of the new lots.
  • The Applicant should provide testimony to whether the proposed subdivision is in character with