Page 6
| REQUIRED R-20 | REQUIRED R-1 | PROPOSED NEW LOT 31.01 | STATUS |
|---|
| Side Yard Setback | 15 ft | 20 ft | ± 10 ft (EV)(9) | Pre-Existing Non-Conforming Condition |
For New Lot 20.01: Per §244-47D new lots created by subdivision after the date of this section should comply with the R-3 zoning standards unless connected to public sewer. New Lot 20.01 is serviced by an on-site septic system, therefore is required to meet the R-3 Zone requirements.
For New Lot 31.01: The most restrictive zone is the R-1 Zone. The proposed dwelling located on New Lot 31.01 encroaches into the R-1 Zone; therefore, the chart above reflects the relief required based on the R-1 Zone bulk requirements.
Per §244-46D the minimum lot area is 130,000 sf, whereas 43,871.91 sf is proposed for New Lot 20.01.
Per §244-46D the minimum lot width is 200 ft, whereas 101.09 ft is provided for New Lot 20.01.
Per §244-46D the minimum front yard setback is 80 ft, whereas 54.8 ft is a pre-existing non-conforming condition for New Lot 20.01.
Per §244-46D the minimum side yard setback is 50 ft, whereas 21.4 ft is a pre-existing non-conforming condition for New Lot 20.01.
Per §244-46D the minimum side yard setback for an accessory garage is 50 ft, whereas 10.6 ft is a pre-existing non-conforming condition for the existing garage on New Lot 20.01.
Per §244-46D the minimum side yard setback for an accessory pool is 50 ft, whereas 29.2 ft is a pre-existing non-conforming condition for the above ground pool on New Lot 20.01.
Per §244-47D the minimum lot width is 150 ft, whereas 100 ft is provided on New Lot 31.01.
Per §244-47D the minimum side yard setback for an accessory shed is 15 ft, whereas 1.7 ft is a pre-existing non-conforming condition for the existing shed on New Lot 31.01.
Per §244-47D the minimum side yard setback for an accessory pool is 20 ft, whereas approximately 10 ft is a pre-existing non-conforming condition for the inground pool on New Lot 31.01.
With the exception of the following, Plan issues are deferred to the Board Engineer.
The Applicant should provide testimony to discuss any previous approvals, and any relief granted for the site.
The Applicant should provide testimony to discuss the purpose of the proposed subdivision.
The Applicant should provide testimony to discuss the proposed configuration of the new lots.
The Applicant should provide testimony to whether the proposed subdivision is in character with