APPENDIX D SOIL EROSION COMPUTATIONS
Adherence to the Standards for Soil Erosion and Sediment Control Standards requires basin routings based upon the presumption that the basins and recharge systems are full to the elevation of the first outlet structure for the 2 and 10 year storm events. The enclosed routings show that safe passage of the 2 and 10 year storm events will result for all cases, indicating compliance.
Note that computations are based upon no ex-filtration from any SSIB, and the presumption that it is full to the first outlet.
1. Rip Rap Apron
for Tw > 1/2 Do
q=Q/Wo La=3(q/Do^{0.5}) Wa=3Wo+0.4La D50=(0.02q^{1.33})/Tw
for Tw <1/2 Do
q=Q/Wo La= 1.8(q/Do^{0.5}) + 7Do W= 3Wo + La D50=(0.02q^{1.33})/Tw
IDQ 25qTwWoLaWaD50 (inches)
FES 10.300.240.121.250.654.00.30
FES 22.82.240.121.256.06.26
FES 30.80.640.121.251.74.51.1