Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTRULTRULTRULTRL
Priority1U1234U45678910111213
Number of Lanes001000100000100
ConfigurationLTTRLR
Volume (veh/h)326829513161012
Percent Heavy Vehicles (%)3333
Proportion Time Blocked
Percent Grade (%)0
Roth Turn Clannerized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)4.17.16.27.4
Critical Headway (sec)4.16.436.236.4
Base Follow-Up Headway (sec)2.23.53.33.5
Follow-Up Headway (sec)2.23.533.333.5
Delay, Queue Length and Level of Service
Flow Rate, v (veh/h)32929
Capacity, c (veh/h)1211512512
v/c Ratio0.000.060.06
95% Queue Length, Qs (veh)0.00.20.2
95% Queue Length, Qs (ft)0.05.15.1
Control Delay (SVeh)8.00.012.512.5
Level of Service (LOS)AABB
Approach Delay (SVeh)0.1725725
Approach LOSAB

Major Street East-West

印

HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersection
Agency/CoMRAJurisdiction
Date Performed3/4/2026East/West Street
Analysis Year2036North/South Street
Time AnalyzedPMPeak Hour Factor
Intersection OrientationEast-WestAnalysis Time Period (hrs)
Project Description26-120PFB BUILD