Page 10 of 11
Add storm event elevations to the SSIB #2 and SSIB #3 Ret/Det Cross-Section details on Sheet 2.
Add distance between (outside of) pipes on the SSIB #2 and SSIB #3 Ret/Det Cross-Section details on Sheet 12.
The Kh values used in the Hantush Groundwater Mounding Analysis in the Stormwater Management Report are greater than the "5 times the Recharge Rate (R)" used in the Coastal Plain and should be revised.
Clarify the #4, #9 and "County" values shown on the Post Developed Drainage Area Schedule on Sheet 14.
A 0.5 footcandle line shall be added to the layout.
Any approval which the Jackson Township Planning Board may grant should be conditioned upon the following items being addressed prior to signing the map:
Compliance with all technical revisions and/or corrections previously indicated.
Plan revisions required by the denial of any requested variances and/or design waivers.
Receipt of approvals and compliance with all permit conditions from any Federal, State, County or local regulatory agency having jurisdiction over this application.
Posting of required performance bond and payment of required inspection fees.
Evidence of comprehensive general liability insurance coverage in accordance with ordinance standards.
Submission of an agreement from the applicant requesting that the appropriate section of Tile 39, Subtitle 1 be made applicable to this site for police regulation of onsite traffic control devices.
Submission of an electronic file containing the entire site development.
Submission of a Formal Description of Operations detailing and outlining all use and operation disclosures as well as any Board imposed limitations and/or restrictions.
Compliance with all standards as well as any special conditions which the Planning Board may impose.
Submission of recorded documents addressing the specific requirements of Ordinance Section 244-209J relative to future maintenance of the project's stormwater management system.