The applicant and its consultants have made every effort possible to design and plan this residential community in concert with the existing and surrounding natural resources.
The project will require the following irreversible and irretrievable commitment of resources as well as produce the following unavoidable impacts:
Approximately 0.85 acres of forest vegetation to be removed.
Approximately 450 GPD is to be discharged by public sewage.
Average water demand of 450 GPD from the JTMUA public water system.
Increased utilization of energy such as electricity and natural gas.
Decrease in air quality due to increased traffic.
Compliance with all state, local and municipal regulations shall be demonstrated by the necessity to obtain all required approvals prior to the commencement of construction.