===== PAGE 1 ===== ## US 98 Resurfacing from south of Prairie Drive to US 301 449168-1-52-01
Project Details
Work TypeMilling and Resurfacing
PhaseDesign
LimitsUS 98 from south of Prairie Drive to US 301
Length1.015 miles
CityDade City
CountyPasco
RoadUS 98
Contact Information Design Manager Dinyar Sharifabad 813-975-6172 Dinyar.Sharifabad@dot.state.fl.us Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us ## ORANGE VALLEY
Image
Map data ©2026 Google ## About The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 98 in Pasco County. Other improvements include signing and pavement marking, signalization, and lighting upgrades. Construction is currently anticipated to begin Summer 2028.