===== PAGE 1 =====
# Railroad Dynamic Envelope Striping- Hillsborough County - multiple locations 447027-1-52-01
| Project Details |
| Work Type | Striping |
| Phase | Completed |
| Project Start | December 2020 |
| County | Hillsborough |
| Construction Cost | $158,246.00 |
| Estimated Completion | Spring 2021 |
| Contractor | Traffic Control Products of FL. Inc. |
Contact Information
Project Information
Kouser Manzer
813-612-3200
Kouser.Manzer@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
## About
## FINAL ACCEPTED ON MARCH 10, 2021
This project is installing Dynamic Envelopes at multiple railroad crossings in Hillsborough County.
## Locations of crossing:
• US 41 in Lutz
• Fowler Avenue (SR 582)
Busch Boulevard (SR 580)
• Nebraska Avenue (US 41)
• Florida Avenue (US 41 B)
• 56th Street (SR 583)
• Hillsborough Avenue (US 92)
• 40th Street (SR 599)
• MLK Boulevard (SR 574) - two locations
• Causeway Boulevard (SR 676)
• US 41 in Palm River
• US 41 in Gibsonton
• US 41 in Apollo Beach