| Project Details | |
| Work Type | Sidewalk |
|---|---|
| Phase | Design |
| Limits | SR 54 from east of Gunn Highway to east of Crossing Boulevard |
| Length | 2.76 miles |
| City | Odessa |
| County | Pasco |
| Road | SR 54 |
Contact Information
Design Manager
Stephanie Wolchok 813-975-6244
Stephanie.Wolchok@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to construct a six-foot sidewalk on the north side and a 10-foot sidewalk on the south side of SR 54, from Gunn Highway to Crossing Boulevard in Pasco County.
The project also includes adding an eastbound right turn lane approaching Altamont Lane.
Construction is not funded at this time.