===== PAGE 1 ===== ## US 301 (Gall Boulevard) Widening from SR 56 to SR 39 416564-2-52-01
Project Details
Project Details
Work TypeWidening
PhaseDesign
Limitsfrom south of SR 56 to south of SR 39
Length2 miles
CityZephyrhills
CountyPasco
RoadGall Boulevard US 301
Contact Information
Design Manager
Eyra Cash813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia813-975-6060
Kayla.Mejia@dot.state.fl.us
Southport Springs Community
Image
Hillsborough River Corridor ## Google Map data ©2020 Google ## About This project will widen US 301 from two lanes to a four-lane divided road with medians, adding bike lanes, a sidewalk on the east side and a shared use path on the west side. Design is underway. Construction is not funded at this time.