Parcel B

Purpose 2 Moderate/Strong Moderate/Strong

Purpose 3 Strong Strong

Purpose 4 Strong Strong

GW(e) Existing Contribution With Reserve Site Impacts

Purpose 1 Strong Strong

Overall Impact of Allocation Sites on Green Wedge (e) None. No sites are within the designation.

Overall Impact of Reserve sites on Green Wedge (e) None. No sites are within the designation.

Potential Direction of Extension to Green Wedge (e) None identified.

C36