Parcel B
Proposed Allocation Sites
None.
Cumulative Impact of Proposed Allocation Sites in Parcel:
N/A.
Impact of Proposed Allocation Sites on Parcel Scoring:
Not affected.
Parcel B
Purpose 1 Strong Strong
Purpose 2 Moderate/Strong Moderate/Strong
Purpose 3 Strong Strong
Purpose 4 Strong Strong
GW (ci) Existing Contribution With Allocation Impacts
Reserve Sites:
None.
Cumulative Impact of Reserve Sites in Parcel
N/A
Impact of Reserve Sites on Parcel Scoring
Not affected.
GW (ci) Parcel B
Purpose 1 Strong Strong
Purpose 2 Moderate/Strong Moderate/Strong
Purpose 3 Strong Strong
Purpose 4 Strong Strong
Existing Contribution Impacts
With Reserve Site
Parcel C
Proposed Allocation Sites
None.
Cumulative Impact of Proposed Allocation Sites in Parcel:
N/A
C17