SR 580 (Main Street) Resurfacing from west of Pinehurst Road to west of Enterprise Road
451237-1-52-01
| Project Details |
| Work Type | Resurfacing |
|---|
| Phase | Design |
|---|
| Limits | SR 580 (Main Street) from west of Pinehurst Road to west of Enterprise Road |
|---|
| Length | 1.87 miles |
|---|
| City | Dunedin |
|---|
| County | Pinellas |
|---|
| Road | Main Street SR 580 |
|---|
Contact Information
Design Manager
Anh-Thu Nguyen
813-975-6197
Anh-Thu.Nguyen@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of SR 580 (Main Street) in Pinellas County.
Other improvements include sidewalk repairs, ADA upgrades and, widening bike lanes to 6 feet where feasible.
Construction is currently anticipated to begin in fall of 2028.