Tampa Bay Florida Department of Transportation
I-75 Intelligent Transportation System from Big Bend Road to Progress Boulevard 434027-1-52-01
Project Details
Work TypeIntelligent Transportation System
PhaseCompleted
LimitsFrom south of Big Bend Road to south of Progress Boulevard
Project StartApril 2019
CityGibsonton Riverview
CountyHillsborough
RoadI-75
Construction Cost$3,891,051
Estimated CompletionFall 2020
ContractorTransCore ITS, LLC
Contact Information
Project Information
SalemDhouib
813-612-3300
Salem.Dhouib@dot.state.fl.us
Media Contact
Kayla Mejia813-975-6060
Kayla.Mejia@dot.state.fl.us
About
COMPLETION DATE: 10/31/20
This $3.9 million design-build project will install an Intelligent Transportation System components along I-75 from south of Big Bend Road to south of Progress Boulevard including nine miles of fiber optic cable, eleven closed-circuit television cameras, and eleven Microwave Vehicle Detection units in Hillsborough County.
An Intelligent Transportation System, or ITS, uses a variety of devices including electronic roadway signs, (called dynamic message signs) and closed-circuit television cameras to monitor roadway congestion, lane closures, and current weather or emergency conditions and advise motorists of travel times.
Construction is anticipated to finish fall of 2020.