Repaving Multiple Locations at SR 688 (Ulmerton Rd) and SR 580 (Main St) 449780-1-52-01

Project Details
Work TypeRepaving
PhaseCompleted
LimitsSR 688 (Ulmerton Road) at two locations and SR 580 (Main Street) from Countryside Blvd to east of Mueller's Lane
Project StartAugust 29, 2022
CityLargo Safety Harbor St. Petersburg
CountyPinellas
RoadSR 580 SR 688 Ulmerton Road
Construction Cost$4.7 million
Estimated CompletionFall 2023
ContractorAjax Paving Industries of Florida LLC

About

As of August 9, 2023, all construction activities associated with this project have been completed.

This project will repave portions of Ulmerton Road and Main Street in Pinellas County.

The locations are as follows:

  • Ulmerton Road ramps to and from I-275 in St. Petersburg
  • Ulmerton Road between US 19 and 49th Street North in Largo
  • SR 580 between Countryside Boulevard and Mueller's Lane in Safety Harbor

Construction is underway and is estimated to finish in the fall of 2023.

Contact Information

Project Information

Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us