Henry Canal Drainage Improvements from Church Avenue to Himes Avenue 422929-8-52-01
| Project Details |
| Work Type | DrainageImprovement |
|---|
| Phase | Design |
|---|
| Limits | from ChurchAvenue toHimes Avenue |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
The project will re-grade and stabilize the canal slopes along the Henry Canal between Church and Himes avenues. Activities in this contract will resolve the slope stability and erosion issues along the drainage canal.
The project is currently in design.