Forest Ridge Blvd. New Sidewalks from CR 486/Norvell Bryant Hwy to W. Lake Beverly Dr. 439698-1-52-01

Project Details
Work TypeNew sidewalks
PhaseCompleted
Limitsfrom CR 486/Norvell Bryant Hwy to W. Lake Beverly Dr.
Project StartNovember 2, 2021
Length1.9 miles
CountyCitrus
Construction Cost$2.2 million
Estimated CompletionSpring 2022
ContractorGosalia Concrete Constructors

Contact Information

Project Information Dave Hoover 352-848-2600 David.Hoover@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

All work has been completed and the project was final-accepted from the contractor on May 31, 2022.

This project added new 5 foot wide sidewalks near Forest Ridge Elementary School at the following locations;

  • along the east side of Forest Ridge Blvd. from CR 486 to the Publix Entrance,
  • along the west side of Forest Ridge Blvd. from CR486 to Forest Ridge Elementary School,
  • along the east side of Forest Ridge Blvd from Forest Ridge Elementary School to Honey Locust Drive,
  • along the west side of Forest Ridge Blvd. from Honey Locust Drive to W. Lake Beverly Dr.
  • along the west side of Forest Ridge Blvd from Roosevelt Blvd to Central Ridge Library
  • along the south side of West Lake Beverly Drive to the Beverly Hills Community Center