SR 54 Repaving from Virginia City Dr to Old Mill Pond Drive 447952-1-52-01

Project Details
Work TypeResurfacing
PhaseCompleted
Limitsfrom west of Virginia City Drive to Old Mill Pond Drive
Project StartMay 7, 2025
Length1.47 miles
CityNew Port Richey
CountyPasco
RoadSR 54
Construction Cost$5.45 million
Estimated CompletionMarch 2026
ContractorPreferred Materials Inc.

Contact Information

Project Information

John McShaffrey (813) 975-6930 john.mcshaffrey@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us

About

As of March 10, 2026, all construction activities associated with this project have been completed. This project milled and repaved SR 54 from west of Virginia City Drive to Old Mill Pond Drive in the New Port Richey area of Pasco County. The traffic signal at Rowan Road was upgraded as part of this project. In addition, the median opening east of Rowan Road was closed. Minor drainage and signing/pavement marking work items also took place. The alignment of the road was not altered from the existing conditions and all improvements were made within the existing rights-of-way. Day and night lane closures were used as needed to complete the various work activities.