Do not force a hyperscale campus into office, warehouse, or generic industrial categories.
POWER USE COOLING
CAMPUS SCALE
continuous large load
MW scale + phasing
mechanical yards
water / air / closed-loop
backup or temporary
generators / BESS / islanded
generation
multi-building buildout
over several years
Planning lesson:
Define data centers separately, then decide scale tiers, approval path, and required information before the first application arrives.
LI NNN COUNTY