How many megawatts are needed, as well as transmission, substation, generation, battery or backup infrastructure and is the developer expecting to pay for those upgrades (which could affect costs or risks to other customers)?
What is the ramp-up schedule (e.g., phased by building/campus phase, whether transmission/substation upgrades are needed)?