===== PAGE 1 =====
Alt US 19, SR 687, SR 699, SR 688, SR 60, SR 586, SR 580 Highway Lighting Upgrades in Pinellas County 439829-5-52-01
| Project Details |
| Work Type | Highway Lighting Upgrades |
| Phase | Completed |
| Limits | Varies by location |
| Project Start | October 2019 |
| City | Clearwater Dunedin Largo Oldsmar Palm Harbor St. Pete Beach St. Petersburg Treasure Island |
| County | Pinellas |
| Road | 4th Street 5th Avenue North Alt US 19 Gulf Boulevard Gulf To Bay Boulevard (Pinellas) SR 580 SR 60 SR 687 SR 688 SR 699 Tampa Road Ulmerton Road Walsingham Road |
| Construction Cost | $409,385 |
| Estimated Completion | Summer 2020 |
| Contractor | PowerCore, Inc. |
| Contact Information |
| Project Information |
| Sarah Gansz | 737-575-8300 |
| Sarah.Gansz@dot.state.fl.us |
## About
## FINAL ACCEPTED ON TUESDAY, MAY 5, 2020
This project will upgrade the highway lighting at numerous intersections throughout Pinellas County.
## List of intersections:
• Alt. US 19 (3 intersections) between 8th Street North and 16th Street North in St. Petersburg
• SR 687 (17 intersections) between 4th Avenue South and Brighton Bay in St. Petersburg
• SR 699 (11 intersections) between Pinellas Bayway in St. Pete Beach and 117th Avenue in Treasure Island
• SR 688 (22 intersections) between Hamlin Boulevard in Largo and Feather Sound Drive in St. Petersburg
• SR 60 (4 intersections) between US 19 and Hampton Road in Clearwater
• SR 586 (10 intersections) between Alt 19/Bayshore in Dunedin and Tampa Road in Oldsmar
• SR 580 (15 intersections) between Patricia Avenue in Dunedin and McMullen Booth Road in Palm Harbor
Construction is expected to finish in the summer of 2020.
===== PAGE 2 =====
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Last Updated: 08/17/2022