===== PAGE 1 =====
## SR 586 (Curlew Road) Drainage Improvements from US 19 to Countryside Boulevard 452125-2-52-01
| Project Details |
| Work Type | DrainageImprovements |
| Phase | Design |
| Limits | from US 19 to CountrysideBoulevard |
| Length | 1.258 Miles |
| City | Safety Harbor |
| County | Pinellas |
| Road | Curlew RoadSR 586 |
Contact Information
Design Manager
Melissa Mulvaney
813-975-6783
Melissa.Mulvaney@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
leicher Rd
HEIG Map data ©2023 Google
## About
This project will replace the drainage system along SR 586 (Curlew Road) from US 19 to Countryside Boulevard in Pinellas County.
This project is currently in the design phase. Construction is anticipated to begin in 2026.