US 92 (Gandy Boulevard) Resurfacing from Brighton Bay Boulevard to Gandy Bridge 451238-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
LimitsUS 92 (Gandy Boulevard) from Brighton Bay Boulevard to Gandy Bridge
Length3.4 miles
CitySt. Petersburg
CountyPinellas
RoadGandy Boulevard SR 600 US 92

About

The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Gandy Boulevard in Pinellas County.

Contact Information

Design Manager

Jason Jordan

813-975-6169

Jason.Jordan@dot.state.fl.us

In addition to resurfacing, the project also includes signing and pavement markings, ADA facility upgrades and, driveway modifications.

Other improvements include median modifications to accommodate a third westbound lane from San Fernando Drive.

Construction is currently anticipated to begin in Spring 2028.

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us