===== PAGE 1 =====
# SR 569 (N 39th Street) Resurfacing from SR 60 to E 15th Avenue 451452-1-52-01
| Project Details |
| Work Type | Resurfacing |
| Phase | Design |
| Limits | SR 569 (N 39th Street) from S.R. 60 (E Adamo Drive) to E 15th Avenue |
| Length | 0.8 miles |
| City | Tampa |
| County | Hillsborough |
| Road | SR 569 |
| Contact Information |
| Design Manager |
| Digvijay Patil, P.E. |
| 813-975-6176 |
| Digvijay.Patil@dot.state.fl.us |
| Media Contact |
| Kayla Mejia |
| 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
Map error: g.co/staticmapperror
Map data ©2025 Google
## About
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (S.R.) 569 in Tampa.
Construction is currently anticipated to begin in Spring 2028.