===== PAGE 1 ===== # SR 569 (N 39th Street) Resurfacing from SR 60 to E 15th Avenue 451452-1-52-01
Project Details
Work TypeResurfacing
PhaseDesign
LimitsSR 569 (N 39th Street) from S.R. 60 (E Adamo Drive) to E 15th Avenue
Length0.8 miles
CityTampa
CountyHillsborough
RoadSR 569
Contact Information
Design Manager
Digvijay Patil, P.E.
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Image
Map error: g.co/staticmapperror Map data ©2025 Google ## About The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (S.R.) 569 in Tampa. Construction is currently anticipated to begin in Spring 2028.