US 92 (Baker Street) Resurfacing from east of Park Road to County Line Road 450338-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
LimitsUS 92 (Baker Street) from east of Park Road to County Line Road
Length2.95 miles
CityPlant City
CountyHillsborough
RoadBaker Street SR 600 US 92

Contact Information

Design Manager

Digvijay Patil

813-975-6176

Digvijay.Patil@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of US 92 (Baker Street) in Plant City.

Construction is currently anticipated to begin in Spring 2028.