SR 54 at Altamont Lane Median Improvements in Pasco County 254677-6-24

Project Details
Work TypeSafety
PhaseCompleted
Limitsat Altamont Lane
Project StartApril 20, 2026
CityOdessa
CountyPasco
RoadSR 54
Construction Cost$640,000
Estimated CompletionJuly 9, 2026
ContractorCone & Graham, Inc

Contact Information

Project Information Maddie Griffin 727-575-8334 Maddie.Griffin@dot.state.fl.us

Media Contact

Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us

About

As of July 9, 2026, all construction activities associated with this project have been completed.

The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is making median improvements on SR 54 at Altamonte Lane in Pasco County.

Other safety improvements include roadway widening, milling and resurfacing, and installing a new traffic separator.

Construction activities are expected to be complete in summer of 2026.

***** *****

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.