SR 679 (Pinellas Bayway) Pedestrian Improvements from 13th Street to Yacht Club Lane in Pinellas County 254677-6-13
| Project Details | |
| Work Type | Safety Improvements |
|---|---|
| Phase | Completed |
| Limits | from 13th Street to Yacht Club Lane |
| Project Start | March 9, 2025 |
| Length | 1.05 miles |
| City | Tierra Verde |
| County | Pinellas |
| Road | SR 679 |
| Construction Cost | $730,000 |
| Estimated Completion | July 14, 2025 |
| Contractor | Cone & Graham, Inc. |
Contact Information
Project Information Bryce Johns 727-575-8334 Bryce.Johns@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
All construction activities associated with this project are complete as of July 14, 2025.
How to use a pedestrian mid-block crosswalk
The Florida Department of Transportation's Design-Build Firm, Cone & Graham, Inc., has made pedestrian safety improvements on SR 679 (Pinellas Bayway) from 13th Street to Yacht Club Lane in Pinellas County.
Elements of work included a new mid-block pedestrian crosswalk at Yacht Club Lane and sidewalk modifications.
Construction activities are complete as of July 14, 2025.
*****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.